| Item | Description |
|---|---|
| Develop a naming convention for projects and tasks | Each project in Visma Net is assigned a unique project ID. Project IDs can be comprised of segments with optional validation of each segment. Plan the structure of the project ID based on the segmented key PROJECT: number of segments, length of segments, whether and how they should be validated, and whether auto-numbering should be used. Note that the PROJECT segmented key is also used for project templates, so decide whether you want the IDs of projects to differ from the IDs of templates. Prepare a list of valid entries for segments that should be validated. Design a numbering sequence for an auto-numbered segment, if one will be used. Plan also the structure for the task IDs (the segmented key PROTASK ). The task ID should be unique only within a project. Two different projects can have tasks with the same identifier, and they will be different tasks. For this reason, you should not use auto-numbering for task IDs. |
| Define non-project code | Once the Projects workspace is enabled, the system will require project IDs and project task IDs for every transaction in all the integrated workspaces of Visma Net. This does not mean that each transaction must be linked to a project; you can enter the non-project code (which you define) for a transaction that is not related to any project. For convenience, the non-project code should be distinctly different from project IDs and should be short, such as the single character X, which is used by default. |
| Define account groups | The role of account groups in Projects is similar to the role of accounts in the General ledger: All transaction processing and all reporting in Projects are done by using account groups. When defining account groups, first identify the accounts that will be used in project-related transactions. Customer ledger accounts (accounts debited by project invoicing) and supplier ledger accounts (accounts credited by purchase invoices) should be excluded. For each identified group, write down the following:
For more information, see: About account groups |
| Develop a naming convention for account groups | Plan the structure of IDs to be used for account groups. The structure is defined by the ACCGROUP segmented key. The account group IDs can mimic the general ledger account numbers or be text IDs, such as BUDGET, REVENUE, and EXPENSE. If needed, the IDs can be defined with multiple segments. Use similar IDs for similar account groups to be able to specify ranges of account groups (arranged alphabetically) when defining allocation rules. |
| Plan labour items | Labour items provide information about hourly rates, general ledger accounts, and VAT categories to be used to account for labour on projects. The general ledger accounts used for labour items should be mapped to appropriate account groups; otherwise, the transactions related to labour on projects will not be visible in the Projects workspace. Decide what different types of labour are involved with projects and how they differ (thus, how their settings will differ). Decide how many labour items you will need for these types of labour. |
| Create a list of non-stock items to be used in projects | Write down all non-stock items to denote services, miscellaneous expenditures that may be used for projects, and various types of labour. Select the general ledger accounts to be used for those items and note that the accounts should be mapped to the defined account groups. |
| Plan reason codes | To issue a stock item from a warehouse for a project, you have to specify a reason code that would provide appropriate accounts for the transaction. The accounts specified for the reason codes should be mapped to appropriate account groups. |
| Plan attributes | Attributes can be used to store additional information about projects. You can define the types of UI controls to be used for attributes and the lists of possible values; you can even make them required elements in the windows. |
| Plan on integrating Projects with other workspaces | The Projects workspace can be integrated with the General ledger, Supplier ledger, Customer ledger, Purchases, Inventory, and Cash management workspaces. Integration with a specific workspace means that projects are visible in this workspace, and the users can enter project-related transactions in this workspace. Particular projects and their tasks can have their own (more narrow) visibility scopes. Whether or not the Projects workspace is integrated with the General ledger and Customer ledger workspaces, the system will post the Projects transactions to the General ledger workspace and generate sales invoices. |
| Define integration with time and expenses | If you are going to track the time your employees’ work on specific projects, integrate the Projects workspace with the Time and expenses workspace. With this integration, the Time and expenses workspace will initially release the employee time cards to the Projects workspace; then, on allocation, the Projects workspace will post them to General ledger. |
| Decide whether you need to track time on activities | Enabling the Time reporting on activities functionality will allow you to track the work time and overtime your employees spend on the activities related to projects. This functionality should be included in your license. Also, plan the activity types for which you want to track time. |
| Create a list of employees who will work for projects | Make sure that all the employees who will work on projects have employee and user accounts; also, make sure that their hourly rates are specified and the appropriate labour items are defined. |
| Design roles | Design the roles you need for users who will configure rate tables, set up allocation and invoicing rules, manage projects, and enter the data for projects. |
| Define @Rates (rate tables) | In Projects, @Rate is a parameter used in formulas of the allocation and invoicing rules. Different rates can be applied to different transactions based on many related factors, such as particular tasks or projects, account groups, stock items involved, particular employees participating, and the particular step of the allocation or invoicing. For example: You can charge customers for consultant work differently depending on the particular consultant involved in a project. In the context of rate tables, rate is a number (@Rate) that you can use in allocation rules as a multiplier, an addend, or a constant value. For instance: To implement a price model that estimates the project price as total costs plus 10 percent, you can define a @Rate of 1.1 in the appropriate rate table and calculate the project price as the total cost multiplied by this rate. For more information about rates and rate tables, see: About rate tables and Configure a rate table |
| Define earning types | You will need non-stock items to account for labour on projects. |
| Design allocation rules | Allocation rules define how to:
For more information about allocation rules, see: Allocation rules (PM207500) |
| Design invoicing rules | Invoicing rules define how to invoice the customers for work performed by your company on specific projects. For more information about project invoicing, see: About project invoicing |
| Consider creating templates for projects and tasks | Review the planned projects, group them by similar properties, and decide on creating project templates. Review the project tasks, and write down a list of the tasks that are common for most projects (common tasks). Also, create lists of tasks specific for each group of projects to include them in respective project templates. |
| ID | Description |
|---|---|
| 9 | Services |
| 10 | Project expenses (Travel) |
| ID | Description |
|---|---|
| 8 | Services |
| 9 | Project expenses (Travel) |
| Department ID | Description |
|---|---|
| CONSULT | Consultancy |
| Position ID | Description |
|---|---|
| PMANAGER | Project manager |
| Rate table | Description |
|---|---|
| STANDARD | Standard rate able |
| Type | Description |
|---|---|
| 1 | Invoicing rate for labour |
| 2 | Invoicing rate for material |
| 3 | Invoicing rate for subcontractors |
| 4 | Invoicing rate for travel expenses |
| 1 - Fixed price, unrecognised revenue | Projects your company has negotiated a fixed price with the customer for. |
| 2 - Time and material, unrecognised revenue | Projects you invoice the actual use of time, materials, and expenses for. |
| 3 - Time and material with WIP, unrecognised revenue | Same as Time and material, but when the system allocates all time, material, and expense, the system transfers the transactions to a work-in-progress (WIP) account (balance account). |
| 4 - Cost plus project, unrecognised revenue | These projects do not use the rate table to calculate the sales rates, but instead use a mark-up percentage for all project transactions. You must enter the mark-up percentage in the Projects (PM301000) window, on the Attributes tab. |
| 5 - None | Can be used for internal projects you only register expenses for. |
| 1 - Standard | A standard invoicing rule that has no particular functionality. You can use this to invoice the transactions that have been registered in the Not yet invoiced account group. |
| 2 - Guaranteed maximum price | An invoicing rule that registers the amount that was entered on the budget on account group revenue, and does not allow any invoicing transactions that could involve exceeding the revised, budgeted quantity or amount (or both). |
| 3 - WIP invoicing | This invoicing rule uses only allocated transactions that include accounts of the WIP account group. |
| 4 - None | This invoicing rule can be used for internal projects or projects that will not be invoiced. |
| Element | Description |
|---|---|
| Account group ID | The unique (and automatically assigned) identifier of the account group. |
| Type | The type of the account group. You can select one of the following options:
|
| Description | The description of the account group. |
| Active | A check box that indicates (if selected) that the account group is used in projects. If the check box is cleared, the account group is not available for selection in any project windows. |
| Column | Description |
|---|---|
| Account | A General ledger account can only be associated with only one account group. |
| Type | Asset, Liability, Income, or Expense. |
| Account class | The account class to which the account is assigned. |
| Description | A description of the account. These descriptions are created in the Chart of accounts (GL202500) window. |
| Currency | The currency of the account. |
| Default | A check box that indicates (if selected) that the account is the default account for the account group. |
| Column | Description |
|---|---|
| Attribute | The attribute name. |
| Required | A check box that indicates (if selected) that this attribute is mandatory. |
| Value | The value of the attribute for this account group. |
| Element | Description |
|---|---|
| Allocation rule | The unique identifier of the rule. |
| Description | The description of the allocation rule. |
| Element | Description |
|---|---|
| Step ID | The identifier of the step in the allocation rule. |
| Description | The description of the step. |
| Column | Description |
|---|---|
| Allocation method | The method to be used for allocation. Select one of the following options:
|
| Create allocation transaction | If you select this check box, the system will create the allocation transactions resulting from this step. If you do not select this check box, the resulting transactions will be placed on a clipboard until used by another allocation step. |
| Element | Description |
| Select transactions | The way the system should select the transactions to be used as the basis for generating allocation transactions in this step. Select one of the following options:
|
| Account group From | The account group that starts the range of account groups whose transactions are involved in this allocation step. (The account groups are ordered alphabetically.) This field is only available if the From previous allocation steps option in the Transaction options section is selected. |
| Range start | The starting step that opens the range of previous steps,so that their allocation transactions can be used by the current step. This field is only available if, under the Select transactions, you have selected the option From previous allocation steps. |
| Account group To | The account group that ends the range of account groups involved in this allocation step. (The groups are ordered alphabetically.) This field is only available if, under the Select transactions, you have selected the option From previous allocation steps. |
| Range end | The step to end the range of previous steps whose allocation transactions will be used by the current step. This field is only available if, under the Select transactions, you have selected the option From previous allocation steps. |
| Element | Description |
|---|---|
| Rate type | The rate type to be used for this step of the allocation rule. |
| If @Rate is not defined | The default action you want the system to perform if the value for the @Rate has not been defined after execution of the step. Select one of the following options:
|
| Element | Description |
|---|---|
| Quantity formula | The formula you want to use to calculate the quantity for allocation transactions.
Click You can also use other transaction parameters to calculate the quantity. The resulting value is normally used to track task or project completion or the total quantity for the task or project. |
| Formula invoiceable qty. | The formula for calculating the invoiceable quantity for allocation transactions.
Click You can also use any other transaction parameters to calculate the invoiceable quantity. Generally, you use this field to define the quantity for which you will charge the customer during invoicing. |
| Amount formula | The formula for calculating the amount of allocation transactions.
Click You can also use any other transaction parameters to calculate the amount. The resulting value is normally used to track task or project completion or the amount for the task or project. |
| Description formula | The formula you can use to generate the descriptions for allocation transactions.
Click If you use this step of the allocation rule to accumulate invoiceable amounts, the text the formula generates will be displayed on the invoice. |
| Element | Description |
|---|---|
| Post transaction to General ledger | If you select this check box,the allocation transactions will be posted to the general ledger. If you do not select this check box, the transactions are not posted to the general ledger. Instead, they are only used to track analytical or statistical information for projects, and you can only specify account groups (not accounts) in the Debit transaction and Credit transaction sections. |
| Reverse allocation | Indicates when the allocation transactions should be reversed. Select one of the following options:
|
| Date source | Indicates how the date for the allocation transactions is defined. The following options are available:
|
| Create transaction with zero qty. | If you select this check box,the system will create the allocation transaction, even if it has a quantity of zero. As a result, such transactions will be available in the invoice after you run invoicing. If you do not select this check box, the system will not create transactions with zero quantities. |
| Create transaction with zero amount | If you select this check box,the system will create the allocation transaction, even if it has an amount of zero. As a result, such transactions will be available in the invoice after you run invoicing. If you do not select this check box, the system will not create transactions with zero amounts. |
| Create non-invoiceable transaction | If you select this check box,the system will create the allocation transaction, even if it is not invoiceable. As a result, such transactions will be available in the invoice after you run invoicing. If you do not select this check box, the system will not create transactions that are not invoiceable. |
| Can be used as source in another allocation | When this is selected, you can use it as a source in another allocation. |
| Element | Description |
|---|---|
| Project | Two fields that you can use to select the project for the allocation’s debit transactions. In the left field, choose one of the following options:
|
| Task | Two fields that you can use to select the task for the allocation’s debit transactions. In the left field, choose one of the following options:
|
| Account group | When the Post transaction to general ledger check box is selected for the current allocation step, you see two fields. If not, you see one. In the left field, choose one of the following options:
In the right field, you can (if the above mentioned check box is selected) select the account group for the allocation’s debit transactions. |
| Account origin | Two fields that you can use to select the account for the allocation’s debit transactions. These fields are available only if you have selected the Post transaction to general ledger check box for the current allocation step. In the left field, choose one of the following options:
|
| Subaccount | Two fields that you can use to select the subaccount for the allocation’s debit transactions.
Note
These fields are only available if the Post the transaction to the general ledger check box is selected for the current allocation step. Use the left field to specify the subaccount mask to be used to generate subaccounts for this step. To specify the mask, for each segment, select the source of segment values, which can be one of the following options:
|
| Element | Description |
|---|---|
| Project | Two fields that you can use to select the project for the allocation’s credit transactions. In the left field, choose one of the following options:
|
| Task | Two fields that you can use to select the task for the allocation’s credit transactions. In the left field, choose one of the following options:
|
| Account group | Two fields that you can use to select the account group for the allocation’s credit transactions. These fields are only available if the Post transaction to general ledger check box is selected for the current allocation step. In the left field, choose one of the following options:
In the right field, you can (if the above mentioned check box is selected) select the account group for the allocation’s credit transactions. |
| Account origin | Two fields that you can use to select the account for the allocation’s debit transactions. These fields are available only if you have selected the Post transaction to general ledger check box for the current allocation step. In the left field, choose one of the following options:
|
| Subaccount | Two fields that you can use to select the subaccount to be used for the allocation’s credit transactions. These fields are available only if the Post transaction to General ledger check box is selected for the current allocation step. Use the left field to specify the subaccount mask to be used to generate subaccounts for this step. To specify the mask, for each segment, select the source of segment values, which can be one of the following options:
Use the right field to select the subaccount if the A option is selected at least for one segment. |
| Element | Description |
|---|---|
| The Aggregate transactions section | A set of check boxes that control how the system breaks the underlying transactions into groups when it generates the corresponding project transactions. You can also group transactions by using multiple criteria. For instance: If you apply grouping by employee and by item, Visma Net first breaks the underlying transactions by employee and then combines the transactions within the groups by stock items. The amount of each resulting transaction will be a sum of all transaction amounts in each subgroup.
|
| Element | Description |
|---|---|
| Project ID | The unique ID for the project. You can click the link to navigate to the Projects (PM301000) window and view the details of the selected project. |
| Description | The description of the project. |
| Task ID | The identifier of the task. |
| Item ID | The item that is used in the revenue or cost budget line. |
| Account Group | The account group of the revenue or cost budget line. |
| Type | The type of the budget line, which has one of the following values: Asset, Expense, Liability, Income, or Off-balance. |
| Description | The description of the revenue or cost budget line. |
| Budgeted quantity | The budgeted quantity of the revenue or cost budget line. |
| UoM | The unit of measure of the revenue or cost budget line. |
| Unit rate | The price of the specified unit. |
| Budgeted amount | The original budgeted amount of the revenue or cost budget line. |
| Revised quantity | The revised quantity if the budget quantity has been revised for the project after the initial budgeting. By default, this quantity is equal to the Budgeted quantity value specified for the line. |
| Revised amount | The revised amount if the budget amount has been revised for the project after the initial budgeting. By default, this quantity is equal to the Budgeted quantity value specified for the line. |
| Actual quantity | The total quantity of the released project transactions that correspond to the budget line with the complex key of project, project task, account group, item ID, and cost code (if applicable). |
| Actual amount | The total amount of the released project transactions that correspond to the budget line with the complex key of project, project task, account group, item ID, and cost code (if applicable). |
| Committed amount | The total amount of the commitments that are associated with the project, project task, and account group. |
| Committed open amount | The total open amount of the commitments that are associated with the project, project task, account group, item ID, and cost code (if applicable). |
| Committed invoiced amount | The total invoiced amount of the commitments that are associated with the project, project task, account group, item ID, and cost code (if applicable). |
| Element | Description |
|---|---|
| All records tab | This tab lists all the existing project budget lines of any balance type ( Asset, Expense, Liability, Income, or Off-balance ). |
| Expenses tab | This tab lists all the existing project budget lines of the Expense type. |
| Income tab | This tab lists all the existing project budget lines of the Income type. |
| Column | Description |
|---|---|
| Project ID | The unique identifier for the project. |
| Column | Description |
|---|---|
| Type | The type of the budget line, which has one of the following values: Asset, Expense, Liability, Income, or Off-balance. |
| Element | Description |
|---|---|
| Ref. no. | The reference number of the change order, which the system automatically assigns. |
| Status | The status of the document, which can be one of the following:
|
| Class ID | The change order class of the order. |
| Customer name | The name of the customer on the change order. |
| Customer no. | The number of the customer on the change order. |
| Project ID | The ID of the project connected with the change order. |
| Description | The description of the project. |
| Revenue change no. | The number of the change order that affect the project revenue within the project, which the system uses for printing. The revenue change number is an integer that the system assigns sequentially, starting from 1 and then 2, 3, and so on. The last assigned number for the change orders of the project is shown in the Last revenue change no. field in the Project properties section of the Summary tab of this window. |
| Description | The description provided for the change order. |
| Change date | The date on which the changes made with the change order should be recorded in the project balances. |
| Approval date | The date that is communicated to the customer as the approval date of the agreed-upon changes. |
| Project no | The number of the project associated with the change order. If the change order has at least one line on the Revenue budget, Cost budget, or Commitments tab, you cannot change the project for the change order. |
| Revenue budget change total | The total amount of the changes of the change order to the revenue budget of the project. |
| Gross margin | The difference between the Revenue budget change total and the Cost budget change total values. |
| Created on | The creation date of the change order. |
| Display name | The display name of the change order. |
| Last modified | The date when the change order has been last modified. |
| Selected | The check box you select to select the order for processing. |
| Element | Description |
|---|---|
| Release | Releases the change order. |
| Actions | Provides the following menu commands:
This action is available if the currently selected change order is released. |
| Reports | Provides the Print change order menu command, which you click to navigate to the Change order (PM643000) report. |
| Field | Description |
|---|---|
| Ref. no | The reference number of the change order, which the system automatically assigns. |
| Status | The status of the document, which can be one of the following:
|
| Hold | A check box that indicates (if selected) that the change order is a draft and thus has the On hold status. |
| Change date | The date on which the changes made on the change order should be recorded in the project balances. |
| Approval date | The date that has been communicated to the customer as the approval date of the agreed-upon changes. |
| Contract time change, days | A positive or negative number of days that represents the delay of the contract and is used in reports. |
| Description | The description provided for the change order. |
| Class | The class of the change order, which is defined in the Change order classes (PM203000) window and provides default settings for the change order. If a change order class has been selected in the Default change order class field on General settings tab of the Project accounting preferences (PM101000) window that class is inserted into this field by default when you create a new change order, but you can select another class. |
| Project | The project associated with the change order. If the change order has at least one line on the Revenue budget, Cost budget, or Commitments tab, you cannot change the project for the change order. |
| Customer | The customer associated with the project. |
| External reference no | The external reference number of the change order. |
| Revenue change no. | The number of the change order that can affect the revenue within the project. That is, the change order class has the Revenue budget check box selected on the Details tab of the Change order classes (PM203000) window. You can manually change the Revenue change no. (duplicate numbers within the project are not allowed, however). If you change this number for the change order, you should respectively change the last revenue change no. of the project in the Project properties section of the Summary tab of the Projects (PM301000) window so that the system continues to assign these numbers correctly. For the changes orders that cannot affect the project revenue and the reversing change orders, this number is read-only and equal to N/A. |
| Revenue budget change total | The total amount of the changes of the change order to the revenue budget of the project, which is the total of the Amount column on the Revenue budget tab of the Change orders (PM308000) window. |
| Commitments change total | The total amount of the changes of the change order to the commitments of the project, which is the total of the Amount in base currency column on the Commitments tab of the Change orders (PM308000) window. |
| Cost budget change total | The total amount of the changes of the change order to the cost budget of the project, which is the total of the Amount column on the Cost budget tab of the Change orders (PM308000) window. |
| Gross margin amount | The difference between the revenue budget change total and the cost budget change total values. |
| Gross margin % | The system calculates this percentage by using the following formula: (Revenue budget change total – Cost budget change total ) / Revenue budget change total * 100. |
| Element | Description |
|---|---|
| Project task | A task of the project. If you add a new line and the project has the default project task, this task is automatically populated in the column. |
| Item ID | The identifier of the item associated with the cost budget line of the project. This column is shown if Task and item is selected as the Revenue budget level of the project on the Summary tab of the Projects (PM301000) window. |
| Cost code | The cost code associated with the cost budget line of the project. This column is shown if the Cost codes functionality is enabled in the Enable/disable functionalities (CS100000) window and Task and cost code is selected as the Cost budget level of the project on the Summary tab of the Projects (PM301000) window. |
| Account group | The income account group associated with the cost budget line of the project. |
| Description | The description of the cost budget line that is associated with the project, project task, account group, and cost code or item. |
| Quantity | The quantity of the change order line. |
| UoM | The unit of measure of the cost budget line. This column is read-only for existing cost budget lines. |
| Unit rate | The price of the specified unit of the cost budget line. This column is read-only for existing cost budget lines. |
| Amount | The amount of the change order line in the base currency. |
| Original budgeted quantity | The original budgeted quantity of the cost budget line that is associated with the same project, project task, account group, and cost code or item. This column is read-only. |
| Original budgeted amount | The original budgeted amount of the cost budget line that is associated with the same project, project task, account group, and cost code or item. The amount is displayed in the base currency. This column is read-only. |
| Previously approved CO quantity | The total quantity of the released change orders that were created before the current one and that are associated with the same project, project task, account group, and cost code or item. This column is read-only. |
| Previously approved CO amount | The total amount of the released change orders that were created before the current one and that are associated with the same project, project task, account group, and cost code or item. The amount is displayed in the base currency. This column is read-only. |
| Revised budgeted quantity | The sum of the Original budgeted quantity and Quantity values. This column is read-only. |
| Revised budgeted amount | The sum of the Original budgeted amount and Amount values. The amount is displayed in the base currency. This column is read-only. |
| Revised committed quantity | The total revised quantity of the commitments that are associated with the project, project task, account group, and cost code or item. This column is read-only and is shown only if the Internal cost commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Revised committed amount | The total revised amount of the commitments that are associated with the project, project task, account group, and cost code or item. The amount is displayed in the base currency. This column is read-only and is shown only if the Internal cost commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed received quantity | The total received quantity of the commitments that are associated with the project, project task, and account group. This column is read-only and is shown only if the Internal cost commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed invoiced amount | The total invoiced quantity of the commitments that are associated with the project, project task, and account group. This column is read-only and is shown only if the Internal cost commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed open quantity | The total open quantity of the commitments that are associated with the project, project task, and account group. This column is read-only and is shown only if the Internal cost commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed invoiced amount | The total invoiced quantity of the commitments that are associated with the project, project task, and account group. This column is read-only and is shown only if the Internal cost commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed CO quantity | The total quantity of the commitment lines of released change orders that were created before the current one and that are associated with the same project, project task, account group, and cost code or item. This column is read-only and is shown only if the Internal cost commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed CO amount | This column is read-only and is shown only if the Internal cost commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Actual quantity | The total amount of the commitment lines of released change orders that were created before the current one and that are associated with the same project, project task, account group, and cost code or item. The amount is displayed in the base currency. The total quantity of the lines of the released customer invoices that refer to the cost budget line with the same project, project task, account group, and cost code or item. This column is read-only. |
| Actual amount | The total amount of the lines of the released customer invoices that refer to the cost budget line with the same project, project task, account group, and cost code or item. The amount is displayed in the base currency. This column is read-only. |
| Other draft CO amount | The total amount of the lines of the unreleased change orders (except for the current one) that refer to the cost budget line with the same project, project task, account group, and cost code or item. The amount is displayed in the base currency. This column is read-only. |
| Element | Description |
|---|---|
| Included | An unlabelled check box that you select to upload this cost budget line to the change order if you then click Add lines or Add lines and close. |
| Add lines | Uploads the selected cost budget lines to the change order. The dialog box remains open. |
| Add lines and close | Uploads the selected cost budget lines to the change order and closes the dialog box. |
| Cancel | Cancels your selections and closes the dialog box. |
| Select commitments | Opens the Select commitments dialog box, which shows the list of purchase order lines associated with the corresponding project that you can add to the change order. |
| Element | Description |
|---|---|
| Status | The status of the commitment line of the change order, which can be one of the following:
This column is read-only for an existing commitment. |
| Project task | A task of the project. If you add a new line and the project has the default project task, this task is automatically populated in the column. This column is read-only for an existing commitment. |
| Item ID | The identifier of the item associated with the commitment. This column is read-only for an existing commitment. |
| Cost code | The cost code associated with the revenue budget line of the project. This column is shown if the Cost codes functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Description | The description of the commitment that is associated with the project, project task, account group, and cost code or item. |
| Quantity | The quantity of the commitment. |
| Description | The description provided for the change order. |
| UoM | The unit of measure of the commitment. This column is read-only for an existing commitment. |
| Unit cost | The price of the specified unit of the commitment in the currency of the purchase order. This column is read-only for an existing commitment. |
| Amount | The amount of the commitment in the currency of the purchase order. |
| Account | The expense account associated with the commitment. This column is read-only for an existing commitment. |
| Supplier | The supplier associated with the commitment. This column is read-only if the supplier is selected for the commitment line. |
| Purchase order no. | The reference number of the purchase order. In this column, you can select any normal purchase order with the On hold, Pending printing, Pending email, or Open status that has at least one non-cancelled or non-completed line. If a supplier is selected for the line, you can select a purchase order associated with only the selected supplier. |
| Order date | The date of the commitment. For an existing commitment, this is the date of the purchase order associated with the commitment. For a commitment line with the New document status, this column is empty by default. This column is read-only. |
| Currency | The currency of the purchase order associated with the commitment. For a commitment line with the New document status, this is the default currency. This column is read-only for an existing commitment. |
| Purchase order line no. | The number of the purchase order line associated with the commitment. For a commitment line with the New line or New document status, this column is empty by default. |
| Draft invoices amount | The total amount of the lines of pro forma invoices that refer to the revenue budget line with the same project, project task, account group, and cost code or item and for which the corresponding customer invoices have not been released yet. This column is read-only. |
| Line description | The description of the purchase order line associated with the commitment. This column is read-only. For a commitment line with the New line or New document status, this column is empty. |
| Order qty. | The original quantity of the purchase order line associated with the commitment. This column is read-only. For a commitment line with the New line or New document status, this column is empty. |
| Line amount | The original amount of the purchase order line associated with the commitment. The amount is displayed in the currency of the purchase order. This column is read-only. For a commitment line with the New line or New document status, this column is empty. |
| Open qty. | The open quantity of the purchase order line associated with the commitment. This column is read-only. For a commitment line with the New line or New document status, this column is empty. |
| Open amount | The open amount of the purchase order line associated with the commitment. The amount is displayed in the currency of the purchase order. This column is read-only. For a commitment line with the New line or New document status, this amount is zero. |
| Amount in base currency | The amount of the commitment in the base currency. This column is read-only. |
| Total potentially revised amount | The sum of the Amount and Line amount values. The amount is displayed in the currency of the purchase order. This column is read-only. |
| Total potentially revised quantity | The sum of the Quantity and Order qty. values. The amount is displayed in the currency of the purchase order. This column is read-only. |
| Element | Description |
|---|---|
| Supplier | The supplier for which you want to view purchase order lines. If you want to see the purchase order lines associated with all suppliers, leave this field blank. |
| Purchase order no. | The reference number of the purchase order for which you want to view lines. If you want to see purchase order lines associated with all purchase orders, leave this field blank. In this column, you can select any normal purchase order with the Pending printing, Pending email, or Open status that has at least one non-cancelled or non-completed line. If a supplier is selected in the Selection area of the dialog box, you can select only a purchase order associated with the selected supplier. |
| Cost code from | The first cost code of the range for which you want to view purchase order lines. If you want to see the purchase order lines associated with all cost codes, leave this field blank. This field is shown if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Cost code to | The last cost code of the range for which you want to view purchase order lines. If you want to see the purchase order lines associated with all cost codes, leave this field blank. This field is shown if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Item ID | The item for which you want to view purchase order lines. If you want to see the purchase order lines associated with all items, leave this field blank. |
| Project task | The project task for which you want to view purchase order lines. If you want to see the purchase order lines associated with all tasks, leave this field blank. |
| Element | Description |
|---|---|
| Project task | The project task associated with the purchase order line. |
| Item ID | The item of the purchase order line. |
| Cost code | The cost code associated with the purchase order line. This field is shown if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Purchase order no. | The reference number of the purchase order. |
| Supplier | The supplier associated with the purchase order. |
| Order date | The date of the purchase order. |
| Purchase order line no. | The number of the purchase order line. |
| Line description | The description of the purchase order line. |
| Order qty. | The quantity of the purchase order line. This column is read-only. For a commitment line with the New line or New document status, this column is empty. |
| UoM | The unit of measure of the purchase order line. |
| Unit cost | The price of the specified unit of the purchase order line in the currency of the purchase order. |
| Received qty. | The received quantity of the purchase order line. |
| Line amount | The amount of the purchase order line. |
| Alternate ID | The alternate identifier used for the item of the purchase order line. |
| Promised | The date when the item’s delivery was promised. |
| Supplier ref. | The supplier reference number specified for the purchase order. |
| Add lines | Uploads the selected cost budget lines to the change order. The dialog box remains open. |
| Add lines and close | Uploads the selected cost budget lines to the change order and closes the dialog box. |
| Cancel | Cancels your selections and closes the dialog box. |
| Element | Description |
|---|---|
| Attribute | The attribute used for the change order. |
| Required | When this check box is selected, this attribute is required for the change order. |
| Value | The value of the attribute for the change order. |
| Element | Description |
|---|---|
| Class ID | The unique identifier of the change order class. |
| Description | The description of the change order class. |
| Active | A check box that indicates (if selected) that the change order class is available for selection in the Change orders (PM308000) window. |
| Element | Description |
|---|---|
| Cost budget | A check box that indicates (if selected) that you can modify existing cost budget lines and add new ones with change orders of this class. |
| Revenue budget | A check box that indicates (if selected) that you can modify existing revenue budget lines and add new ones with change orders of this class. |
| Commitments | A check box that indicates (if selected) that you can modify existing commitments and add new ones with change orders of this class. |
| Element | Description |
|---|---|
| Active | A check box that indicates (if selected) that the attribute is available for the change orders of this class. You can deactivate an obsolete attribute by clearing the check box. In this case, the deactivated attribute will no longer be displayed for the change orders of this class, but all attribute values that have already been specified for existing change order still will be stored in the database. Thus, if you re-activate the attribute, its values will become visible in the system again. |
| Attribute ID | The attribute identifier, which has been specified in the Attributes (CS205000) window. |
| Description | A read-only field showing the description that has been provided for the attribute. |
| Sort order | An integer that defines the position of the attribute in the list of attributes available for the entity type. You should specify 1 for the first attribute you want to be listed, 2 for the second, and so on. |
| Required | A check box that indicates (if selected) that the user must specify a value for this attribute on the appropriate data entry form. |
| Control type | A read-only field displaying the element type of the attribute. |
| Default value | A default value of the selected attribute, which is specified in the Attributes (CS205000) window. |
| Element | Description |
|---|---|
| Create external commitment | Opens the External commitments (PM209000) window, which you can use to create a new external commitment. |
| Element | Description |
|---|---|
| Project | The identifier of the project whose commitments you want to view. To see the commitments associated with all projects, leave this field blank. |
| Account group | The account group for which you want to view commitments. To see the commitments associated with all account groups, leave this field blank. |
| Project task | The project task for which you want to view commitments. To see the commitments associated with all tasks, leave this field blank. |
| Cost code | The cost code for which you want to view commitments. If you want to see commitments associated with all cost codes, leave this field blank. The field is available if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Item ID | The item for which you want to view commitments. To see the commitments associated with all items, leave this field blank. |
| Revised quantity | A read-only field that displays the total quantity of the commitments that meet the criteria you have selected. |
| Revised amount | A read-only field that displays the total amount of the commitments that meet the criteria you have selected. |
| Open quantity | A read-only field that displays the total open quantity of the commitments that meet the criteria you have selected. |
| Open amount | A read-only field that displays the total open amount of the commitments that meet the criteria you have selected. |
| Received quantity | A read-only field that displays the total received quantity of the commitments that satisfy the criteria you have selected. |
| Invoiced quantity | A read-only field that displays the total invoiced quantity of the commitments that satisfy the criteria you have selected. |
| Invoiced amount | A read-only field that displays the total invoiced amount of the commitments that meet the criteria you have selected. |
| Element | Description |
|---|---|
| Related document | The document related with the commitment. |
| Type | The type of the commitment, which can be one of the following options:
|
| Project | The project associated with the commitment. |
| Account group | The account group that was updated by the commitment. |
| Project task | The project task associated with the commitment. |
| Item ID | The item associated with the commitment. |
| Cost codes | The cost code associated with the commitment. The field is available if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| External ref. no | The reference number of the commitment of the External type. You can click the link in this column to open in a pop-up window the External commitments (PM209000) window, which you can use to modify or delete the external commitment. |
| UoM | The unit of measure of the commitment. |
| Original committed quantity | The original quantity of the commitment that does not include the changes of change orders. For a the commitment of the Internal type, this quantity is equal to the quantity of the corresponding line of the sales or purchase order from which the commitment originates. In the Projects (PM301000) window, this quantity is included in the Committed quantity of the budget line associated with the same project, project task, stock item, and account group if the budget line has a UoM that the system can convert to the UoM of the commitment by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Original committed amount | The original amount of the commitment that does not include the changes of change orders. For a commitment of the Internal type, this amount is equal to the amount of the corresponding line of the sales or purchase order from which the commitment originates. For a commitment of the Internal type, this amount is equal to the ext. price of the corresponding line of the sales order or to the ext. cost of the corresponding line of the purchase order from which the commitment originates. |
| Committed CO quantity | The total quantity of the cost commitment lines of released change orders that are associated with the commitment. This quantity is calculated as the difference between the revised committed quantity and the original committed quantity. |
| Committed CO amount | The total amount of the cost commitment lines of released change orders that are associated with the commitment. This amount is calculated as the difference between the revised committed amount and the original committed amount. |
| Revised committed quantity | The received quantity of the commitment. The revised quantity of the commitment. For a the commitment of the Internal type, the revised quantity is equal to the quantity of the corresponding line of the sales or purchase order from which the commitment originates. For a newly created commitment or for a commitment that no change order affects, this quantity is equal to the original committed quantity. |
| Revised committed amount | The invoiced quantity of the commitment. The original amount of the commitment. For a commitment of the Internal type, the revised amount is equal to the ext. price of the corresponding line of the sales order or to the ext. cost of the corresponding line of the purchase order from which the commitment originates For a newly created commitment or for a commitment that no change order affects, this amount is equal to the original committed amount. |
| Committed open quantity | The open quantity of the commitment that has not been received yet. For a commitment of the Internal type, the system calculates this quantity as the difference between the revised committed quantity and the committed received quantity of the commitment. |
| Committed open amount | The open amount of the commitment that has not been received yet. For a commitment of the Internal type, the system calculates this quantity as the difference between the revised committed amount and the received amount of the commitment. |
| Committed received quantity | The received quantity of the commitment. For a commitment of the Internal type, this is the received quantity of the purchase order line or the shipped quantity of the sales order line from which the commitment originates. If the commitment originates from a purchase order line, the system updates the received quantity of the commitment depending on the type of the purchase order line as follows:
If the commitment originates from a sales order line, the system updates the received quantity of the commitment depending on whether a shipment is processed for the sales order as follows:
|
| Committed invoiced quantity | The invoiced quantity of the commitment. |
| Committed invoiced amount | The invoiced amount of the commitment. For a commitment of the Internal type that originates from a purchase order line, the system updates the Committed invoiced amount with the amount of the corresponding line of the released purchase invoice. For a commitment of the Internal type that originates from a sales order line, the system updates the Committed invoiced amount with the amount of the corresponding line of the released sales invoice. |
| Element | Description |
|---|---|
| Task ID | The unique identifier of the common task. The structure of this identifier is defined by the PROTASK segmented key, which was configured in the Segment keys (CS202000) window. |
| Description | The description of the common task. |
| Element | Description |
|---|---|
| Completion method | The method of calculating the percentage of completion for the common task when it is added to a project. The following options are available:
For more information, see: About the calculation of task completion percentage |
| Approver | The default approver to be assigned to the common task to approve time activities. |
| Element | Description |
|---|---|
| Invoice separately | A check box that (if selected) indicates that this common task should be invoiced by a separate invoice. |
| Allocation rule | The rule that Visma Net uses to run allocation for this common task. |
| Invoicing rule | The rule that Visma Net uses to run invoicing for this common task. |
| Branch | The branch of your company with which this common task is associated. |
| Rate table | The rate table to be used for the tasks created based on this common task. |
| Invoicing option | The way the common task becomes eligible for invoicing. You can select one of the following options:
|
| WIP account group | The work-in-progress account group associated with this common task. |
| Element | Description |
|---|---|
| Default account | The account to be used as one of the sources of possible accounts for the invoices and transactions that are generated for the common task. |
| Default subaccount | The subaccount to be used as one of the sources of possible segment values for subaccounts to be used in the invoices and transactions that are generated for the common task. |
| Accrual account | The account to be used as an expense accrual account in the transactions that are generated for the common task. |
| Accrual subaccount | The subaccount to be used as an expense accrual subaccount in the transactions that are generated for the common task |
| VAT category | The VAT category (if applicable) to be used as the default VAT category for the common task. |
| Element | Description |
|---|---|
| General ledger | A check box that indicates whether transactions in the General ledger workspace can be associated with tasks created by using this common task. With this check box selected, users can select the task in general ledger documents, and the release of such documents automatically updates the project data. |
| Supplier ledger | A check box that indicates whether transactions in the Supplier ledger workspace can be associated with tasks created by using this common task. With this check box selected, users can select the task in supplier ledger documents, and the release of such documents automatically updates the project data. |
| Customer ledger | A check box that indicates whether transactions in the Customer ledger workspace can be associated with tasks created by using this common task. With this check box selected, users can select the task in customer ledger documents, and the release of such documents automatically updates the project data. |
| Sales | A check box that indicates whether transactions in the Sales workspace can be associated with tasks created by using this common task. With this check box selected, users can select the task in sales documents, and the release of such documents automatically updates the project data. |
| Purchases | A check box that indicates whether transactions in the Purchases workspace can be associated with tasks created by using this common task. With this check box selected, users can select the task in purchase documents, and the release of such documents automatically updates the project data. |
| Inventory | A check box that indicates whether transactions in the Inventory workspace can be associated with tasks created by using this common task. With this check box selected, users can select the task in inventory documents, and the release of such documents automatically updates the project data. |
| Cash management | A check box that indicates whether transactions in the Cash management workspace can be associated with tasks created by using this common task. With this check box selected, users can select the task in cash management documents, and the release of such documents automatically updates the project data. |
| Time entries | A check box that indicates whether the transactions of the Employee time card (EP305000) and Employee time activities (EP307000) windows (in the Time and expenses workspace) can be associated with the tasks created based on this common task. If you select this check box, users can select the task in documents, and the release of these documents automatically updates the task data. |
| Expenses | A check box that indicates whether transactions of the Equipment time card (EP308000) window (in the Time and expenses workspace) can be associated with the tasks created based on this common task. If you select this check box, users can select the task in documents in the window, and the release of these documents automatically updates the task data. |
| Column | Description |
|---|---|
| Type | A read-only field that displays the type of the selected account group: Asset, Liability, Income, or Expense. |
| Account group | The group of accounts for which the budgeted amount are specified. |
| Item ID | The stock or non-stock item. You can select an item from the list of items associated with accounts of the specified account group and specify the budget for this item. By default, the system populates this field with the empty item code (N/A), which is defined in the Empty item code field in the Project accounting preferences (PM101000) window. For the empty item code, you can specify the budget for all transactions associated with this account group that are not linked to any particular stock item. |
| Description | The description of the budget line. |
| Budgeted quantity | The quantity of the item or service planned for the common task. |
| UoM | The unit of measure for the budget line, such as HOUR or BOX. |
| Unit rate | The price of the item or the rate of the service. |
| Budgeted amount | The total budgeted amount for the budget line. Visma Net automatically calculates the value as the product of the values in the Budget qty. and Rate columns, but you can override the value in this column by specifying the amount manually as long as the task has the In planning status. |
| Auto completed (%) | A check box that you select to make the system automatically calculate the percentage of task completion for a project based on the selected Completion method. You can select this check box for any number of lines of the Expense type. |
| Column | Description |
|---|---|
| Non-stock item | The non-stock item that designates the service or labour associated with the common task. |
| Description | The description of the service or labour associated with the common task. |
| Item fee | The flat price for the service or labour. |
| Account source | The source of the account for the invoicing transactions, which can be one of the following:
|
| Subaccount mask | The rule for selecting segment values for the subaccount to be used for recurring invoicing transactions. To set up the rule for selecting segment values, select a segment, press F3, and select a source of the segment value, which is one of the following options:
|
| Account | The account to be used in the invoicing transaction if the account source is set to Task. |
| Subaccount | The subaccount to be used in the invoicing transaction if the subaccount mask uses T. |
| Reset usage | The setting that indicates whether the system resets the quantity of the service or labour, which is specified as the Included value, when invoicing is performed. You can select one of the following options:
|
| Included | The quantity of the service or labour that is included in the invoicing period. If the quantity of service or labour provided to the customer exceeds this value for the current invoicing period, the entire extra quantity is charged at the regular rate. |
| UoM | The unit of measure used for the service or labour. |
| Element | Description |
|---|---|
| Attribute | The attribute name. |
| Required | A check box that indicates (if selected) that this is a mandatory attribute. |
| Value | The value of the attribute for this common task. |
| Column | Description |
|---|---|
| External ref. no ID | The identifier of the external commitment. |
| Account group | The account group of the account to be updated with this commitment. |
| Project | The project associated with this commitment. |
| Project task | The project task associated with this commitment. If you select a project that has the default project task, this task is automatically populated in the column. |
| Item ID | The stock or non-stock item that is used in the commitment. By default, the system populates this field with the empty item code, which is initially N/A and you can change it in the Empty item code field in the Project accounting preferences (PM101000) window. |
| UoM | The unit of measure of the commitment. If a stock item is selected in the Item ID field, the system automatically fills this field with the base unit of measure of this item; you can change it to another UoM available for the item. |
| Revised committed amount | The original amount of the commitment. In the Projects (PM301000) window, this amount is included in the revised committed amount of the budget line associated with the same project, project task, account group, and item. |
| Revised committed quantity | The revised quantity of the commitment. In the Projects (PM301000) window, this quantity is included in the revised committed quantity of the budget line associated with the same project, project task, account group, and item if the budget line has a UoM that the system can convert to the UoM of the commitment by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed open amount | The open amount of the commitment that has not been received yet, which is included in the committed open amount of the budget line associated with the same project, project task, item, and account group. |
| Committed open quantity | The open quantity of the commitment that has not been processed yet. In the Projects (PM301000) window, this quantity is included in the committed open quantity of the budget line associated with the same project, project task, item, and account group if the budget line has a UoM that the system can convert to the UoM of the commitment by the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed received quantity | The processed quantity of the commitment (for example, the quantity that has been processed or shipped). In the Projects (PM301000) window, this quantity is included in the committed received quantity of the budget line associated with the same project, project task, item, and account group if the budget line has an UoM that the system can convert to the UoM of the commitment by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed invoiced amount | The invoiced amount of the commitment, which is included in the committed invoiced amount of the budget line associated with the same project, project task, item, and account group. |
| Committed invoiced quantity | The invoiced quantity of the commitment. In the Projects (PM301000) window, this quantity is included in the committed invoiced quantity of the budget line associated with the same project, project task, item, and account group if the budget line has a UoM that the system can convert to the UoM of the commitment by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Element | Description |
|---|---|
| Invoicing rule ID | The unique identifier of the rule. |
| Description | The description of the invoicing rule. |
| Active | A check box that you can select to make the rule available for use in projects and tasks in Visma Net. |
| Element | Description |
|---|---|
| Active | A check box that indicates (if selected) that the step is performed as part of the invoicing process of the project with this invoicing rule applied. |
| Step ID | The identifier, which can be only a numeric value, of the step in the invoicing rule. The steps are performed in ascending order by identifier. |
| Description | The description of the step. |
| Invoice group | The identifier that is used to group the pro forma invoices generated by the steps of the invoicing rule. You can enter any symbols in this column. The lines generated by the steps of the invoicing rules of the project tasks with the same Invoice group (except for those for which the Invoice separately check box is selected on the Summary tab of the Project tasks (PM302000) window) are grouped into a single invoice. A task with the selected Invoice separately check box in the Summary tab of the Project tasks (PM302000) window is invoiced by a separate invoice. |
| Element | Description |
|---|---|
| Invoicing type | The data source for the project invoicing of the step. The following options are available:
You can mix both types of steps in a single invoicing rule if needed, but we recommend that you create no more than one Progress invoicing step per invoicing rule. |
| Element | Description |
|---|---|
| Account group | The account group whose transactions are involved in this invoicing step. |
| Rate type | The rate type to be used for this step of the invoicing rule. |
| If @Rate is not defined | The default action to be performed on execution of the step if the value for @Rate has not been defined in the Rate table maintenance (PM206000) window. Select one of the following:
|
| Element | Description |
|---|---|
| Invoice description formula | The formula to be used to generate the description for the pro forma invoice that is created during invoicing. To enter the formula, click the magnifier icon to open the Formula editor window. If multiple steps of the invoicing rule are used in the creation of a single pro forma invoice, the formula of the topmost step is used for the invoice description. |
| Line quantity formula | The formula for calculating the quantity of a line of the pro forma invoice. To enter the formula, click the magnifier icon to open the window. In addition to the quantities specified in the underlying transactions, you can use any other transaction parameters to calculate the quantity. If you define no formula in this field, the invoiceable quantity of the transaction will be used. This field is shown only if the step has the Time and material invoicing type. |
| Line amount formula | The formula for calculating the amount of a line of the pro forma invoice. To enter the formula, click the magnifier icon to open the window. In addition to the amount specified in the underlying transactions, you can use any other transaction parameters to calculate the amount. This field is shown only if the step has the Time and material invoicing type. Instead of the @Rate parameter, you can also use the @Price parameter to retrieve the effective sales price to calculate the invoicing amount. |
| Line description formula | The formula to be used to generate the description for a line of the pro forma invoice that is created during the invoicing. To enter the formula, click the magnifier icon to open the window. |
| Use destination branch from | The branch to be used for invoicing as the destination branch. The following options are available:
This option is available only if the step has the Time and material invoicing type.
This option is available only if the step has the Progress invoicing invoicing type.
|
| Use sales account from | The account to be used for invoicing as a sales account. The following options are available:
This option is available only if the step has the Time and material invoicing type.
This option is available only if the step has the Progress invoicing invoicing type.
This option is available only if the step has the Time and material invoicing type.
If the empty item code is selected as the stock item, the system uses the sales account of the customer location, which is defined on the General ledger accounts tab of the Customer locations (CR303010). The customer location of the project is defined on the Summary tab of the Projects (PM301000) window.
This option is available only if the step has the Time and material invoicing type.
This option is available only if the step has the Time and material invoicing type. |
| Sales subaccount mask | The subaccount mask to be used for generating sales subaccounts for invoicing. To set up the rule for selecting segment values, select a segment, press F3, and select the source of the segment value, which is one of the following options:
This option is available only if the step has the Time and material invoicing type.
If the empty item code is selected as the stock item, the system uses the sales subaccount of the customer location, which is defined on the General ledger accounts tab of the Customer locations (CR303010) window. The customer location of the project is defined on the Summary tab of the Projects (PM301000) window.
For a segment, the characters designating each option are repeated as many times as there are characters in the segment. This field is available only if the Subaccounts functionalities is enabled in the Enable/disable functionalities (CS100000) window. |
| Destination branch | The destination branch to be used for invoicing if Invoicing rule is selected in the Use destination branch from field. |
| Sales account | The account to be used for invoicing if the Invoicing rule option is selected in the Use sales account from field. This option is available only if the step has the Time and material invoicing type. |
| Sales subaccount | The subaccount to be used for invoicing or as a source of segment values for the mask specified in the Sales subaccount field. This field is available only if the Subaccounts functionalities is enabled in the Enable/disable functionalities (CS100000) window. |
| Element | Description |
|---|---|
| Copy notes and file | A check box that indicates (if selected) that the system will copy to the pro forma invoice the notes and files of the corresponding lines. |
| Include non-invoiceable transactions | A check box that indicates (if selected) that the system will include non-invoiceable transactions in the pro forma invoice. If this check box is not selected, the system will not include non-invoiceable transactions in the pro forma invoice. This option is available only if the step has the Time and material invoicing type. |
| Include transactions with zero amounts | A check box that indicates (if selected) that the system will include a line in the pro forma invoice even if the line has an amount of zero. If this check box is not selected, the system will not add lines with zero amounts to the pro forma invoice. |
| Include transactions with zero quantities | A check box that indicates (if selected) that the system will include a transaction in the pro forma invoice even if the transaction has a quantity of zero. If this check box is not selected, the system will not process transactions that have quantities of zero. This check box is shown only if the step has the Time and material invoicing type. |
| Element | Description |
|---|---|
| Date | A check box that you select to aggregate the transactions with the same date in a single line of the pro forma invoice that is created during the invoicing. |
| Employee | A check box that you select to aggregate the transactions with the same employee in a single line of the pro forma invoice that is created during the invoicing. |
| Supplier | A check box that you select to aggregate the transactions with the same supplier in a single line of the pro forma invoice that is created during the invoicing. |
| Item ID | A check box that you select to aggregate the transactions with the same item in a single line of the pro forma invoice that is created during the invoicing. |
| Element | Description |
|---|---|
| View project (button) | Opens the Projects (PM301000) window, where you can view the details of a project you select. |
| Project manager | The project manager of the projects whose transactions you want view in the table. |
| From project | The ID of the project you want to start your selection from. |
| To project | The ID of the project to you want to end your selection to. |
| From period | The period you want to start your selection from. |
| To period | The period you want to end your selection at. |
| Customer | The customer of the transaction. |
| Invoicing rule | The invoicing rule that applies to the transaction. |
| Status | The status of the projects that you want to view in the table:
|
| Total amount | The total amount of the transaction. |
| Element | Description |
|---|---|
| From period | The period you want to start your selection from. |
| To period | The period you want to end your selection at. |
| Project ID | The ID of the project that the transaction belongs to. |
| Project name | The name of the project that the transaction belongs to. |
| Status | The status of the transaction. |
| Amount | The amount of the transaction. |
| Project manager | The manager of the project that the transaction belongs to. |
| Customer | The name of the customer. |
| Invoicing rule | The invoicing rule that applies to the transaction. |
| Invoicing rule description | The description of the invoicing rule. |
| Account group ID | The ID of the account group. |
| Account group description | The description of the account group. |
| Element | Description |
|---|---|
| Reference no. | The reference number of the document. |
| Element | Description |
|---|---|
| Release | Releases the document.
|
| Actions | Provides the following menu commands, which you can click to invoke actions:
This action is available if the Approval workflow functionality is enabled in the Enable/disable functionalities (CS100000) window and approval is configured for pro forma invoices.
This action is available if the Approval workflow functionality is enabled in the Enable/disable functionalities (CS100000) window and approval is configured for pro forma invoices.
|
| Reports | Provides the Print pro forma invoice menu command, which you click to navigate to the report that is specified for the PROFORMA mailing of the corresponding project on the Mailing Settings tab of the Projects (PM301000) window. If the corresponding project has no mailing setting with the PROFORMA identifier, an error occurs. |
| Element | Description |
|---|---|
| Reference no. | The reference number of the pro forma invoice in the system. |
| Status | The status of the document, which can be one of the following:
This status is available only if the Approval Workflow functionality is enabled in the Enable/disable functionalities (CS100000) window and pro forma invoice approval is configured.
This status is available only if the Approval workflow functionality is enabled in the Enable/disable functionalities (CS100000) window and pro forma invoice approval is configured.
|
| Hold | A check box that indicates (if selected) that the pro forma invoice is a draft and thus has the On hold status. |
| Invoice date | The date on which the pro forma invoice was created. You can change this date, if needed. |
| Post period | The period that corresponds to the invoice date and to which the corresponding customer ledger document should be posted. |
| Description | The description of the pro forma invoice, which is provided by the invoicing rule and can be manually modified. |
| Project | The project associated with the pro forma invoice. |
| Customer | The customer associated with the project. |
| Location | The location of the project related to the pro forma invoice. This element is available only if the Business account locations functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Currency | The currency of the pro forma invoice. This element is available only if the Multi-currency accounting functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Progress invoicing total | The total of the Amount to invoice column on the Progressing invoicing tab. |
| Time and material total | The total of the Amount to invoice column on the Time and material tab. |
| Detail total | The document total, which the system calculates as the sum of the Progress invoicing total and the Time and material total. |
| VAT total | The tax amount of the document, as defined on the VAT details tab. |
| Invoice total | The sum of the Detail total and VAT total values. |
| Over-limit total | The total Over-limit amount from the Time and material tab that exceeds the invoicing limit. The total is shown only if the Use time and material revenue budget limits check box is selected for the project on the Summary tab of the Projects (PM301000) window. The validation level of the invoicing limit may vary, from a simple warning that is shown in this field and does not block the processing of the pro forma invoice to an error that prevents the pro forma invoice from being processed further until the invoice amount is within the limit. The desired behaviour is specified in the Validate time and material revenue budget limits field in the Project accounting preferences (PM101000) window. |
| Element | Description |
|---|---|
| Branch | The branch that sells the item or provides the service. The branch is provided from the source defined by the Use destination branch from setting of the particular step of the invoicing rule in the Invoicing rules (PM207000) window. |
| Project task | The particular task of the project with which this document line is associated. |
| Cost code | The cost code associated with the revenue budget line. The column is available if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Item ID | The stock item which this document line is associated. |
| Description | The description of the line, which is provided by the invoicing rule and can be manually modified. |
| Revised amount | The Revised amount of the corresponding revenue budget line of the project on the Revenue budget tab of the Projects (PM301000) window. |
| Previously invoiced | The running total of the Amount to invoice column on this tab for all the preceding pro forma invoice lines that refer to the same revenue budget line. |
| Total completed (%) | The percentage of the revised amount of the revenue budget line of the project that has been invoiced by all the pro forma invoices of the project, including the current one. You can modify this percentage; in this case, the system automatically recalculates the values in the Amount to invoice and Current invoiced (%) columns of the line. |
| Amount | The original line amount calculated by the progress invoicing rule. This column appears only if the Construction functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Stored material | The amount of material stored. This column appears only if the Construction functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Amount to invoice | The amount to invoice the customer. By default, this is the Pending invoice amount of the corresponding line of the project on the Revenue budget tab of the Projects (PM301000) window. You can modify the amount in this column; in this case, the system automatically recalculates the values in the Total completed (%) and Current invoiced (%) columns of the line. On creation of the sales invoice from the pro forma invoice, the system copies this amount to the Ext. price column of the corresponding line of the sales invoice. |
| Current invoiced (%) | The percentage of the revised amount of the revenue budget line of the project that is invoiced by this pro forma invoice line. You can modify this percentage; in this case, the system automatically recalculates the values in the Amount to invoice and Total completed (%) columns of the line. |
| VAT category | By default, the VAT category of the corresponding revenue budget line of the project on the Revenue budget tab of the Projects (PM301000) window. If no VAT category has been specified for the revenue budget line, the VAT category remains unspecified for the pro forma invoice line. You can override the default value. |
| Sales account | The sales account used for the transaction. The sales account is provided from the source defined by the Use sales account from setting of the particular step of the invoicing rule in the Invoicing rules (PM207000) window. |
| Sales subaccount | The corresponding subaccount used to record this sale transaction. The sales subaccount is provided according to the Sales subaccount mask setting of the particular step of the invoicing rule in the Invoicing rules (PM207000) window. This column appears only f the Subaccounts functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Deferral code | The deferral code assigned to the stock item or non-stock item specified in this document line. Upon release of this document, the system generates a deferral schedule (or multiple schedules) based on the settings defined in this deferral code. You can change the deferral code in this field manually if needed. This column appears only if the Deferred revenue management functionality is enabled in the Enable/disable functionalities (CS100000) window. If you change an MDA deferral code (which indicates that an item is a package) to any non-MDA deferral code, the system will consider the item to not be a package and will ignore its components while generating a deferral schedule. That is, the system will generate the deferral schedule for the item based on the settings of the specified non-MDA deferral code. |
| Actual amount | The Actual amount of the corresponding revenue budget line on the Revenue budget tab of the Projects (PM301000) window that shows the total of the corresponding lines of the released sales invoices. |
| Draft invoices amount | The Draft invoices amount of the corresponding revenue budget line on the Revenue budget tab of the Projects (PM301000) window that shows the total of the corresponding lines of the pro forma invoices for which the corresponding sales invoices have not been released yet. |
| Sort order | The sequence number of the line, which is used to sort the lines on the tab. These numbers are assigned automatically and are changed automatically if you reorder the lines by dragging them to appropriate positions. |
| Line number | The original sequence number of the line among all the pro forma invoice lines. |
| Element | Description |
|---|---|
| Upload non-invoiced transactions | Opens the Upload non-invoiced transactions dialog box, which shows the list of non-invoiced transactions of the corresponding project that can be added to the pro forma invoice. |
| View transaction details | Opens the Transaction details dialog box, which shows the list of project transactions corresponding to the invoice line that were grouped during the invoicing according to the invoicing rule settings. |
| Status | The status that defines how to invoice the line, which can be one of the following:
You can also delete a selected line of the pro forma invoice to invoice it later in the full amount. |
| Branch | The branch that sells the item or provides the service. The branch is provided from the source defined by the Use destination branch from setting of the particular step of the invoicing rule in the Invoicing rules (PM207000) window. |
| Project task | The particular task of the project with which this document line is associated. |
| Item ID | The stock item associated with the corresponding project transaction or the group of transactions aggregated based on the settings of the invoicing rule. |
| Cost code | The cost code associated with the corresponding project transaction. The column is available if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Description | The description of the line, which is provided by the invoicing rule and can be manually modified. |
| Employee | The employee who provided the labour or service associated with the corresponding project transaction or the group of transactions aggregated based on the settings of the invoicing rule. |
| Supplier | The supplier associated with the corresponding project transaction or the group of transactions aggregated based on the settings of the invoicing rule. |
| Date | The date of creation of the corresponding project transaction. |
| Invoiced quantity | The quantity to invoice the customer provided by the invoicing rule. |
| Invoiced amount | The amount to invoice the customer provided by the invoicing rule. |
| Quantity to invoice | The quantity to be invoiced. When the sales invoice is created based on the pro forma invoice, the system copies this quantity to the corresponding line of the sales invoice. By default, this quantity is equal to the invoiced quantity and can be manually modified. |
| UoM | The unit of measure of the corresponding project transaction. |
| Unit price | The price of the item or the rate of the service of the corresponding project transaction. You can modify the unit price. |
| Amount to invoice | The amount to invoice the customer. On creation of the sales invoice from the pro forma invoice, the system copies this amount to the Ext. price column of the corresponding line of the sales invoice. By default, this amount is equal to the Invoiced amount and can be manually modified. The difference between the calculated Invoiced amount and the corrected Amount to invoice is processed based on the Status of the line. If you manually modify the Unit price or Quantity to invoice, the system automatically recalculates this amount as follows. |
| VAT category | By default, this is the VAT category of the item specified in the pro forma invoice line, or the VAT category of the project task if there is no item in the line or the VAT category of the item is not specified. If neither the item nor the task has a VAT category specified, the VAT category is unspecified for the pro forma invoice line. You can override the default value. |
| Sales account | The sales account of the corresponding project transaction. The sales account is provided from the source defined by the Use sales account from setting of the particular step of the invoicing rule. |
| Sales subaccount | The sales subaccount of the corresponding project transaction. The sales account is provided according to the Sales subaccount mask setting of the particular step of the invoicing rule. This column appears only if the Subaccounts functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Deferral code | The deferral code assigned to the stock item or non-stock item specified in this document line. When the document is released, the system generates a deferral schedule (or schedules) based on the settings defined in this deferral code. You can change the deferral code in this field manually if needed. This column appears only if the Deferred revenue management functionality is enabled in the Enable/disable functionalities (CS100000) window. If you change an MDA deferral code (the deferral code that indicates that an item is a package) to any non-MDA deferral code, the system will consider the item to not be a package and will ignore its components while generating a deferral schedule. That is, the system will generate the deferral schedule for the item based on the settings of the specified non-MDA deferral code. |
| Max. available amount | The maximum amount available to invoice the customer based on the invoicing limit amount of the corresponding revenue budget line of the project. If no invoicing limit amount is defined for the revenue budget line of the project or if the Max. limit amount is 0, the max. available amount of each corresponding pro forma invoice line is 0. This column is shown if the Use time and material revenue budget limits check box is selected for the project on the Summary tab of the Projects (PM301000) window. |
| Max. limit amount | The invoicing limit amount ( Maximum amount ) of the corresponding revenue budget line of the project on the Revenue budget tab of the Projects (PM301000) window. If no invoicing limit amount is defined for the revenue budget line of the project, the Max. limit amount of each corresponding pro forma invoice line is 0. The column is shown if the Use time and material revenue budget Limits check box is selected for the project on the Summary tab of the Projects (PM301000) window. |
| Over-limit amount | The amount that exceeds the invoicing limit. The amount is calculated as the difference between the Amount to invoice and Max available amount. If this difference is negative or if the Max available amount is greater than the Amount to invoice, the Over-limit amount is 0. The invoice lines for which the Over-limit amount becomes non-zero exceed the limit. This column is shown if the Use time and material revenue budget limits check box is selected for the project on the Summary tab of the Projects (PM301000) window. |
| Sort order | The sequence number of the line, which is used to sort the lines on the tab. These numbers are assigned automatically and are changed automatically if you reorder the lines by dragging them to the appropriate positions. |
| Line number | The original sequence number of the line among all the pro forma invoice lines. |
| Element | Description |
|---|---|
| Branch | The branch in which the transaction was created. |
| Ref. number | The identifier of the transaction. |
| Stock ID | The identifier of the stock or non-stock item associated with the transaction. |
| Description | The detailed description provided for the transaction. |
| Employee | The employee associated with the transaction, such as the employee who provided the labour or service to the customer. |
| Customer/supplier | The name of the supplier (if the transaction originated in the Supplier ledger workspace) or customer (if the transaction originated in another workspace). |
| Date | The date the transaction was created. |
| Invoiceable | When this check box is selected, the transaction is used when the system calculates the amount that will be charged to the customer. If this check box is not selected, the transaction does not affect the invoicing for the project. |
| Quantity | The quantity of the item or service. |
| UoM | The unit of measure used for the item or service. |
| Invoiced quantity | The quantity that will be invoiced to the customer. |
| Unit rate | The price of the item or the rate of the service. |
| Amount | The amount of the transaction. |
| Account group | The account group of the debit side account of the transaction. |
| Credit account | The account the transaction will credit if it is released. |
| Credit subaccount | The subaccount the transaction will credit if it is released. |
| Debit account | The account the transaction will debit if it is released. |
| Debit subaccount | The subaccount the transaction will debit if it is released. |
| Upload (button) | Uploads the selected transactions to the pro forma invoice. The dialog box remains open. |
| Upload and close (button) | Uploads the selected transactions to the pro forma invoice and closes the dialog box. When a pro forma invoice is created, the system orders the lines of the pro forma invoice on the Time and material tab by the invoicing rule steps applied and by the project transaction reference number within each invoicing step. When you upload non-invoiced transactions, they are appended to the end of list of pro forma lines (so that after upload, you can identify them easily). |
| Cancel (button) | Cancels your selections and closes the dialog box. |
| Element | Description |
|---|---|
| Ref. number | The identifier of the transaction in Visma Net. |
| Stock ID | The identifier of the stock or non-stock item associated with the transaction. |
| Description | The detailed description provided for the transaction. |
| Employee | The employee associated with the transaction, such as the employee who provided the labour or service to the customer. |
| Customer/supplier | The name of the supplier (if the transaction originated in the Supplier ledger workspace) or customer (if the transaction originated in another workspace). |
| Date | The date the transaction was created. |
| Invoiceable | When check box is selected, the transaction is used to calculate the amount that will be charged to the customer. If this check box is not selected, the transaction does not affect the invoicing for the project. |
| Quantity | The quantity for the transaction. |
| UoM | The unit of measure used for the transaction. |
| Amount | The amount of the transaction. |
| Invoiced quantity | The quantity that is used for invoicing the customer. |
| Invoiced amount | The amount that is used for invoicing the customer. |
| Column | Description |
|---|---|
| VAT ID | The identifier of the tax applied to the document. |
| VAT rate | The VAT rate of the tax. |
| Taxable amount | The taxable amount for the tax, which is calculated at the document level. |
| VAT amount | The VAT amount for the specific tax, which is calculated at the document level. |
| Retained taxable | The retained taxable amount for this document. This column appears in the table if the Retainage support functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Retained VAT | The retained VAT amount for this document. This column appears in the table if the Retainage support functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Element | Description |
|---|---|
| Customer ledger doc type | The type of the corresponding customer ledger document created when the pro forma invoice is released. Either a sales invoice or an sales credit note can be generated on release of a pro forma invoice, depending on the sign of the Detail total of the pro forma invoice. |
| Customer ledger ref. no. | The reference number of the corresponding customer ledger document created on release of the pro forma invoice. |
| Branch | The branch to be used on creation of the customer ledger document, which is provided by the project settings. |
| Customer VAT zone | The VAT zone of the customer location. By default, the system inserts the VAT zone associated with the Customer location specified on the Summary tab of the Projects (PM301000) window; if no VAT zone has been specified for the customer location, the customer VAT zone is not filled in. You can override the default value. |
| Terms | The credit terms to be used on creation of the customer ledger document, which is provided by the project settings. |
| Due date | The date when payment for the document is due, in accordance with the credit terms. |
| Cash discount date | The end date of the cash discount period, which the system calculates by using the credit terms. |
| Element | Description |
|---|---|
| Override contact | A check box that indicates (if selected) that the contact information provided by the project settings can be overridden. |
| Business name | The name of the business. |
| Attention | The department or person to be noted on the attention line, if this line is used by your company. |
| Phone 1 | The phone number of the contact person. |
| The email address of the contact person. |
| Element | Description |
|---|---|
| Override address | A check box that indicates (if selected) that the invoicing address provided by the project settings can be overridden. |
| Address line 1 | The first line of the invoicing address. |
| Address line 2 | The second line of the invoicing address. |
| City | The city of the invoicing address. |
| Country | The country of the invoicing address. |
| County | The state or province of the invoicing address. |
| Postcode | The postal code for the invoicing address. An input mask for the postal code can be set in the Countries/counties/postcodes (CS20400S) window. |
| Element | Description |
|---|---|
| Process | Initiates the selected processing (based on the Action you select) for the pro forma invoices you have selected (by using the unlabelled check boxes) in the table. |
| Process all | Initiates the selected processing (based on the Action you select) for all pro forma invoices listed in the table. |
| Element | Description |
|---|---|
| Action | The action to be taken when clicking Process or Process all in the window toolbar. At this time, the Release option is available, which you select to release the pro forma invoices to produce sales invoices. |
| Start date | The start date of the date range for the pro forma invoice dates. You can leave the box blank to view all pro forma invoices up to and including the End date. |
| End date | The end date of the date range for the pro forma invoice dates. You can leave the box blank to view all pro forma invoices starting on the Start date. |
| Element | Description |
|---|---|
| Project | The project for which the pro forma invoice has been created. |
| Reference no. | The reference number of the pro forma invoice. |
| Status | The status of the pro forma invoice. Only invoices of the Open status, which indicates that the user can release these invoices, are listed in this window. |
| Invoice date | The date of the pro forma invoice. |
| Post period | The period to which the corresponding customer ledger document will be posted. |
| Customer | The identifier of the customer associated with the pro forma invoice. |
| Customer name | The name of the customer. |
| Pro forma gross amount in customer currency | The gross amount of the invoice in the customer’s currency. |
| Pro forma customer currency | The amount of the invoice in the customer’s currency. |
| Due date | The date when payment for the document is due, in accordance with the credit terms. |
| Cash discount date | The end date of the cash discount period, which the system calculates by using the credit terms. |
| Element | Description |
|---|---|
| Group name | The name of the restriction group. You can type a name of a new group or select an existing group. |
| Description | The description of the restriction group. You can type a description if this field is empty or edit an existing description. |
| Group type | The type of the restriction group. You can select one of the following types: A, A inverse, B, or B inverse. For more information, see: About types of restriction groups. |
| Active | A check box that (if selected) indicates that the restriction group is active. You can clear the check box to make the group inactive, which means that restrictions imposed by the restriction group do not affect the visibility of entities to users. By default, this check box is selected. |
| Column | Description |
|---|---|
| Login | Read-only. The login of the user. |
| Full name | Read-only. The full name of the user. |
| Comment | Read-only. The additional information that has been specified for the user in the Users (SM201010) window. |
| Column | Description |
|---|---|
| Project ID | Read-only. The identifier of the project. |
| Description | Read-only. The description of the project. |
| Customer | Read-only. The customer associated with the project, if this project is external. For an internal project, no customer is specified. |
| Template | Read-only. The template used for creating this project, if applicable. |
| Status | Read-only. The status of the project. |
| Element | Description |
|---|---|
| Run project invoicing | Initiates invoicing for the currently selected project. You can run invoicing for an Active, Completed, or Suspended project that is not an internal project. |
| Create change order | Initiates creating of a change order. A change order is a document for profitability analysis and an audit trial of changes to the project revenue budget, cost budget, commitments, and time and material. To use the change orders functionality, enable it in the Enable/disable functionalities (CS100000) window. |
| Actions | Provides the following menu commands:
This action is available only when the project has the In planning, Active, or Completed status. For the calculation to be accurate, the project must be properly configured, with the necessary account groups and allocation rules created, and the projected budget for expenses must be specified. For more information about tracking future revenues, see: About labour and revenue allocation |
| Reports |
Opens the Project balance (PM621000) report report for the selected project. |
| Element | Description |
|---|---|
| Project ID | The unique ID for the project. |
| Customer | The customer for the project if this project is external. This value will be used in all invoices generated when you run the invoicing for the project. If you leave this field empty, the project is considered internal and you will not be able to run invoicing for it. |
| Template ID | The template used for creating this project, if applicable. |
| Description | The description of the project. > [!NOTE] > This field supports the multi-language functionality, where you can translate the entered text to multiple languages. For more information, see: About multi-language support |
| Status | The status of the project, which can be one of the following options:
|
| Hold | A check box that you select to indicate that the project should have the In planning status. When you clear the check box, the status changes to Active. |
| Completed % | Manually enter the percentage of finished work. This value is only used in certain reports. |
| Assets | The actual assets for the project. |
| Liabilities | The actual liabilities for the project. |
| Income | The income expected from the project. |
| Expenses | The total of the current expenses incurred by the project. |
| Element | Description |
|---|---|
| Revenue budget level | The detail level of the revenue budget. Depending on the selected level, which can be one of the following options, the Item ID or Cost code column is shown or hidden on the Revenue budget tab:
|
| Start date | The date when the project starts. |
| End date | The date when the project is expected to end. |
| Project manager | The person who is responsible for managing the project and authorised to approve the project task and task activities. |
| Last revenue change no. | The last revenue change number on the project. |
| Change order workflow | When this check box is selected, the creation of change orders is enabled. |
| Restrict employees | When this check box is selected, only the employees listed on the Employees tab of this window can create activities and documents associated with the current project. These capabilities include creating activities on the Activity history tab of this window, time cards in the Employee time card (EP305000) window, and project transactions in the Project transactions (PM304000) window. |
| Track production data | A check box that you select to track the extra values reported by the people at the work site for the project. If you select this check box, the following columns appear on the Cost budget tab: Cost to complete, Cost at completion, Percentage of completion, Last cost to complete, Last cost at completion, and Last percentage of completion. |
| Webhook notifications | When this check box is selected, the system will send a notification when a project is created or updated. An update can consist of changes made to the following tabs: Summary, Employee, Tasks. |
| Element | Description |
|---|---|
| Invoicing period | The frequency of invoicing, which can be one of the following options:
For projects with the Active status, the Invoicing period field is read-only. |
| Next invoicing date | The date for which the next invoicing is scheduled for the project. A value is displayed in this field only for active projects. For newly created projects, the Next invoicing date is calculated as the Start date plus one Invoicing period. For the projects for which the project invoicing has been successfully performed at least once, the Next invoicing date is calculated as the Next invoicing date plus one Invoicing period. For the projects with the On demand invoicing period, the Next invoicing date is always empty. |
| Last invoicing date | The date when the latest invoicing was performed for the project. A value is displayed in this field only for active projects. |
| Terms | The type of credit terms used for invoices in the project. You define credit terms in the Credit terms (CS206500) window. |
| Allocation rule | The default allocation rule that is used for the tasks created for the project. |
| Run allocation when you release project transactions | When this check box is selected, allocation is run automatically during the release of the documents associated with this project. |
| Invoicing rule | The default invoicing rule that is used for the tasks created for the project. |
| Rate table | The rate table to be used with the allocation rules, if applicable. |
| Create a pro forma at the time of invoicing | When this check box is selected, a pro forma invoice is created automatically for the project when you run project invoicing. |
| Use the revenue budget limits for time and material | When this check box is selected, the system will validate the limits of the revenue budget of the project when you process pro forma invoices for the project. The Limit amount and Maximum amount columns are shown on the Revenue budget tab if this check box is selected. |
| Automatically release customer documents | When this check box is selected, invoice documents are released automatically after the project invoicing is completed. |
| Element | Description |
|---|---|
| Customer location | The location of the project’s customer. When the customer is selected, the system populates this field with the customer’s default location. This element is available if the Business account locations functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Element | Description |
|---|---|
| Override contact | When this check box is selected, the contact information provided by the customer’s settings can be overridden. |
| Business name | The name of the business. |
| Attention | The department or person to be noted on the attention line, if this line is used by your company. |
| Phone 1 | The phone number of the contact person. |
| The email address of the contact person. |
| Element | Description |
|---|---|
| Override address | When this check box is selected, the invoicing address provided by the customer’s settings can be overridden. |
| Address 1 | The first line of the invoicing address. |
| Address 2 | The second line of the invoicing address. |
| City | The city of the invoicing address. |
| Country | The country of the invoicing address. |
| County | The county of the invoicing address. |
| Postcode | The postcode for the invoicing address. An input mask for the postal code can be set in the Countries/counties/postcodes (CS20400S) window. |
| Option | Description |
|---|---|
| General ledger | A check box that indicates whether transactions in the General ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in general ledger documents, and the release of these documents will automatically update the project data. |
| Supplier ledger | A check box that indicates whether transactions in the Supplier ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in supplier ledger documents, and the release of these documents will automatically update the project data. |
| Customer ledger | A check box that indicates whether transactions in the Customer ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in customer ledger documents, and the release of these documents will automatically update the project data. |
| Sales | A check box that indicates whether transactions in the Sales workspace can be associated with the project based on this template. If you select this check box, users can select the project in sales documents, and the release of these documents will automatically update the project data. |
| Purchases | A check box that indicates whether transactions in the Purchases workspace can be associated with the project based on this template. If you select this check box, users can select the project in purchase documents, and the release of these documents will automatically update the project data. |
| Inventory | A check box that indicates whether transactions in the Inventory workspace can be associated with the project based on this template. If you select this check box, users can select the project in inventory documents, and the release of these documents will automatically update the project data. |
| Cash management | A check box that indicates whether transactions in the Cash management workspace can be associated with the project based on this template. If you select this option, users can select the associated project and task when they enter a document in the Cash management workspace. |
| Time entries | A check box that indicates whether the transactions in the Time and expenses workspace can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Expenses | A check box that indicates whether transactions from Expense can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Button | Description |
|---|---|
| Add common tasks | Opens the Add tasks dialog box, where you can add a common task or a task associated with the template this project is based on. For more information about common and template tasks, see: About templates for projects and tasks |
| Activate tasks | Assigns the Active status to all the project tasks. |
| Complete tasks | Assigns the Completed status to all the active project tasks and sets 100.00 as the value of the Completed (%) column for all of them. |
| Set as default | Use this button to set a project task as the default for a project. |
| Task ID | The ID of the task. |
| Description | The description of the task. |
| Rate table | The rate table to be used in the allocation rules, if applicable. If the task is created based on the project template selected in the Template field in the top part of this window, the system uses the rate table of the corresponding task of this project template. If no project template is selected for the project, or no rate table is defined for the corresponding task of the selected project template, the system uses the rate table of the project specified in the Rate table field on the Summary tab of this window. |
| Allocation rule | The rule that Visma Net uses to run allocations for the task. If the task is created based on the project template selected in the Template field in the top part of this window, the system uses the allocation rule of the corresponding task of this project template. If no project template is selected for the project, or no allocation rule is defined for the corresponding task of the selected project template, the system uses the allocation rule of the project specified in the Allocation rule field on the Summary tab of this window. |
| Invoicing rule | The rule that Visma Net uses to run invoicing for the task. If the task is created based on the project template selected in the Template field in the top part of this window, the system uses the invoicing rule of the corresponding task of this project template. If no project template is selected for the project, or no invoicing rule is defined for the corresponding task of the selected project template, the system uses the invoicing rule of the project specified in the Invoicing rule field on the Summary tab of this window. |
| Status | The status of the task, which can be one of the following:
|
| Completed (%) | The percentage of the work on the task that has been completed, which is determined as follows based on the value selected in the Completion method field on the Summary tab of the Project tasks (PM302000) window:
For more information, see: About the calculation of task completion percentage |
| Start date | The date when the task was actually started. |
| End date | The date when the task actually ended. |
| Approver | The employee who is authorised to approve the time activities related to the task. |
| Invoicing option | The way the task becomes eligible for invoicing, which can be one of the following:
|
| Default | This check box is automatically selected on the active line, when you click the Set as default button on the top part of the table. |
| Cash management | A check box that indicates whether transactions in the Cash management workspace can be associated with the project based on this template. If you select this option, users can select the associated project and task when they enter a document in the Cash management workspace. |
| Customer ledger | A check box that indicates whether transactions in the Customer ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in customer ledger documents, and the release of these documents will automatically update the project data. |
| Expenses | A check box that indicates whether transactions from Expense can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| General ledger | A check box that indicates whether transactions in the General ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in general ledger documents, and the release of these documents will automatically update the project data. |
| Inventory | A check box that indicates whether transactions in the Inventory workspace can be associated with the project based on this template. If you select this check box, users can select the project in inventory documents, and the release of these documents will automatically update the project data. |
| Purchases | A check box that indicates whether transactions in the Purchases workspace can be associated with the project based on this template. If you select this check box, users can select the projectchase documents, and the release of these documents will automatically update the project data. |
| Sales | A check box that indicates whether transactions in the Sales workspace can be associated with the project based on this template. If you select this check box, users can select the project in sales documents, and the release of these documents will automatically update the project data. |
| Supplier ledger | A check box that indicates whether transactions in the Supplier ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in supplier ledger documents, and the release of these documents will automatically update the project data. |
| Time entries | A check box that indicates whether the transactions in the Time and expenses workspace can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Column | Description |
|---|---|
| Included | A check box that you select for the tasks that you want to add to the project. |
| Task ID | The ID of the task. |
| Description | The description of the task. |
| Approver | The employee assigned to approve time activities associated with the task. |
| Is global | When this is checked, the task is in global use. |
| Add common tasks (button) | Adds the common tasks that you have selected to the current project and closes the dialog box. |
| Cancel (button) | Closes the dialog box without adding any tasks to the current project. |
| Element | Description |
|---|---|
| Project task | A task on the project. If a task is selected, the table lists the revenue budget lines for only this task. |
| Task description | The free-form description of the task you can enter. |
| Group by task | A check box that you select to make the table show all the revenue budget lines with the same task as a single line. When the budget lines are grouped by task, the system shows the total for each numeric column of the table in the bottom-most row. |
| View commitments (button) | Opens the Commitments (PM306000) window in a pop-up window. This window shows the list of commitments that correspond to the selected revenue budget line. This button is available only if the Internal commitment tracking check box is selected in the Commitments (PM306000) window. |
| View transactions (button) | Opens the Project transactions (PM304000) window in a pop-up window. This window shows the list of project transactions that correspond to the selected revenue budget line. |
| Project task | A task on the project. |
| Item ID | The stock or non-stock stock item that is used for the time and material project invoicing. By default, the system populates this field with the empty item code, which is initially N/A and can be changed in the Empty item code field in the Project accounting preferences (PM101000) window. The column is shown if Task and item is selected as the Revenue budget level on the Summary tab of the window for the project. |
| Account group | The income account group of the revenue budget line. |
| Cost code | The cost code that is associated with a revenue budget line. You can change the cost code value for each revenue line. The column is shown if Task and cost code is selected as the Revenue budget level on the Summary tab of the window for the project. |
| Description | The description of the revenue budget line. |
| Original budgeted quantity | The budgeted quantity of the revenue budget line. |
| UoM | The unit of measure of the revenue budget line. If a stock item is selected in the Item ID column, the UoM column is automatically filled in with the base unit of measure of this stock item, which can be changed to another UoM available for the item. The base unit of measure of the empty item code is HOUR. If the revenue budget line is created based on the project template selected in the Template field in the top part of this window, the system uses the UoM of the corresponding revenue budget line of this project template. If no UoM is defined for the corresponding revenue budget line of the selected project template, the system selects the UoM by using the logic described above. |
| Unit rate | The price of the specified unit of the revenue budget line. |
| Original budgeted amount | The budgeted amount of the revenue budget line. For the Budgeted quantity, UoM, and Unit rate specified for the line, the amount is calculated as Budgeted amount = Budgeted quantity * Unit rate. |
| Revised budgeted quantity | The revised budgeted quantity if the budget quantity has been revised for the project after the initial budgeting. By default, this quantity is equal to the Budgeted quantity value specified for the line. |
| Revised budgeted amount | The revised budgeted amount if the budget amount has been revised for the project after the initial budgeting. By default, this amount is equal to the Budgeted amount value specified for the line. |
| Budgeted CO quantity | The budgeted change order quantity of the line. This is available, if the Change order workflow check box is selected on the project. |
| Budgeted CO amount | The budgeted change order amount of the line. This is available, if the Change order workflow check box is selected on the project. |
| Amount limit | A check box that you select to be able to specify the Maximum amount. This column is shown if the Use the revenue budget limits for time and material check box is selected on the Summary tab. |
| Maximum amount | The maximum invoiceable amount for the revenue budget line. This column is shown if the Use the revenue budget limits for time and material check box is selected on the Summary tab. |
| Committed quantity | The total quantity of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed amount | The total amount of commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed received quantity | The total received quantity of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed invoiced quantity | The total invoiced quantity of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed invoiced amount | The total invoiced amount of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed open quantity | The total open quantity of the commitments that are associated with the project, project task, and account group. This column is available onlyif the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed open amount | The total open amount of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Amount for draft invoices | If the Create pro forma on invoicing check box is selected for the project, the total amount of the lines of pro forma invoices for which the corresponding sales invoices have not been released yet. If the Create pro forma on invoicing check box is cleared for the project, the column shows the total amount of unreleased sales invoices. |
| Actual quantity | The total quantity of the lines of the released sales invoices that correspond to the revenue budget line. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Actual amount | The total amount of the lines of the released sales invoices that correspond to the revenue budget line. |
| Actual + open committed amount | The sum of the Actual amount and Committed open amount values. |
| Variance amount | The difference between the Revised amount and Actual + open committed amount values. |
| Completed (%) | The percentage of the work on the task that has been completed. If the Pending invoice amount is manually changed, the Completed (%) is recalculated as follows: |
| Pending invoice amount | The amount to be invoiced on the next execution of the project invoicing process. If the Completed (%) value is manually changed, the column values are recalculated as follows: |
| Performance (%) | The task performance measure, which the system estimates as the ratio (expressed as a percentage) of the actual amount to the revised budgeted amount. |
| VAT category | The VAT category for the revenue budget line. By default, the system inserts the VAT category that has been specified for the item specified in the line. If no item is selected in the line or the item has no VAT category defined, the system inserts into this column the VAT category of the task specified in the line. If the task also has no VAT category defined, this column is empty. If the revenue budget line is copied from a template defined in the Project templates (PM208000) window, by default, the system inserts the VAT category defined in the template. If no VAT category is defined at the template level, the system selects the VAT category using the logic described in the previous paragraph. You can override any default value the system inserts into this column. If you change the item or task for the revenue budget line, the system changes the VAT category by using the logic described above. |
| Element | Description |
|---|---|
| Project task | A task on the project. If a task is selected, the table lists the revenue budget lines with only this task. |
| Task description | The free-form description of the task you can enter. |
| Group by task | A check box that you select to make the table show all the revenue budget lines with the same task as a single line. When the budget lines are grouped by task, the system shows the total for each numeric column of the table in the bottom-most row. |
| View commitments (button) | Opens the Commitments (PM306000) window in a pop-up window. It shows the list of commitments that correspond to the selected cost budget line. This button is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| View transactions (button) | Opens the Project transactions (PM304000) window in a pop-up window. It shows the list of project transactions that correspond to the selected cost budget line. |
| Project task | A task on the project. |
| Item ID | The stock or non-stock stock item that is associated with the cost budget line. The column is shown if Task and item is selected as the Revenue budget level on the Summary tab of the window for the project. |
| Cost code | The cost code that is associated with the cost budget line. You can change the cost code value for each line. The column is shown if Task and cost code is selected as the Revenue budget level on the Summary tab of the window for the project. |
| Account group | The account group to which the corresponding expense account is mapped. In addition to the account groups of the Expense type, you can select the Off-balance account groups for which the Expense check box is selected in the Account groups (PM201000) window. |
| Description | The description of the cost budget line. |
| Original budgeted amount | The budgeted amount of the revenue budget line. For the Budgeted quantity, UoM, and Unit rate specified for the line, the amount is calculated as Budgeted amount = Budgeted quantity * Unit rate. |
| UoM | The unit of measure of the cost budget line. If a stock item is selected in the Item ID column, the UoM is automatically selected as the base unit of measure of this stock item and can be changed to another UoM available for the item. If the cost budget line is created based on the project template selected in the Template field in the top part of this window, the system uses the UoM of the corresponding cost budget line of this project template. If no UoM is defined for the corresponding cost budget line of the selected project template, the system selects the UoM by using the logic described above. If the item is not specified, any existing UoM can be selected. |
| Unit rate | The price of the specified unit of the cost budget line. |
| Budgeted quantity | The budgeted quantity of the task and optionally the stock item. |
| Budgeted amount | The budgeted amount of the task and optionally the stock item. For the Budgeted quantity, UoM, and Unit rate specified for the line, the amount is calculated as Budgeted amount = Budgeted quantity * Unit rate. |
| Revised quantity | The revised quantity if the budget quantity has been revised for the project after the initial budgeting. |
| Revised amount | The revised amount if the budget amount has been revised for the project after the initial budgeting. |
| Budgeted CO quantity | The budgeted change order quantity of the line. You can use this is available, if the Change order workflow check box is selected on the project. |
| Budgeted CO amount | The budgeted change order amount of the line. You can use this is available, if the Change order workflow check box is selected on the project. |
| Committed quantity | The total quantity of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed amount | The total amount of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed received quantity | The total received quantity of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed invoiced quantity | The total invoiced quantity of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected the Project accounting preferences (PM101000) window. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed invoiced amount | The total invoiced amount of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed open quantity | The total open quantity of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed open amount | The total open amount of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Actual quantity | The total quantity of the released Projects transactions that correspond to the cost budget line. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Actual amount | The total amount of the released project transactions that correspond to the cost budget line. |
| Actual + open committed amount | The sum of the Actual amount and Committed open amount values. |
| Variance quantity | The difference between the Revised budgeted quantity and Actual quantity. |
| Variance amount | The difference between the Revised amount and Actual + open committed amount values. |
| Performance (%) | The task performance measure, which the system estimates as the percentage of the actual amount to the revised budgeted amount. |
| Automatically completed (%) | When this check box is selected, the Completed (%) of the corresponding task is calculated automatically, based on the completion method of the task, which is specified in the Project tasks (PM302000) window. |
| Performance (%) | The task performance measure, which the system estimates as the percentage of the actual amount to the revised budgeted amount. |
| Automatically completed (%) | When this check box is selected, the Completed (%) of the corresponding task is calculated automatically, based on the completion method of the task, which is specified in the Project tasks (PM302000) window. |
| Revenue task | The task for which the revenue budget is specified for the cost budget line. |
| Revenue item | The item for which the revenue budget is specified for the cost budget line. This column is shown if Task and item is selected as the Revenue budget level on the Summary tab of this window for the project. |
| Button | Description |
|---|---|
| View transactions | Opens the Project transactions (PM304000) window in a pop-up window. It shows the list of project transactions that correspond to the selected budget line. |
| View commitments | Opens the Commitments (PM306000) window in a pop-up window. It window shows the list of commitments that correspond to the selected budget line. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Account group | The group of accounts for which the actual and budgeted amounts are specified. |
| Description | The description of the account group. |
| Original budgeted amount | The amount budgeted for the project with respect to this account group. |
| Current budgeted amount | The revised budgeted amount for the project with respect to this account group. |
| Actual amount | The actual amount spent on the project with respect to this account group. |
| Performance (%) | The project completion measure, estimated as the ratio (expressed as a percentage) of the actual amount to the revised budgeted amount. |
| Budgeted CO quantity | The budgeted change order quantity of the line. You can use this is available, if the Change order workflow check box is selected on the project. |
| Budgeted CO amount | The budgeted change order amount of the line. You can use this is available, if the Change order workflow check box is selected on the project. |
| Committed amount | The total amount of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed open amount | The total open amount of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Committed invoiced amount | The total invoiced amount of the commitments that are associated with the project, project task, and account group. This column is available only if the Internal commitment tracking check box is selected in the Project accounting preferences (PM101000) window. |
| Actual + open committed amount | The sum of the Actual amount and Committed open amount values. |
| Variance amount | The difference between the Revised amount and Actual + open committed amount values. |
| Element | Description |
|---|---|
| Show purchases | When this check box is selected, you will see the purchase orders connected with the projects, which have purchases order types with the Commitment check box selected. |
| Show sales | When this check box is selected, you will see the sales orders connected with the projects, which have sales order types with the Commitment check box selected. |
| Column | Description |
|---|---|
| Workspace | The workspace connected with the transactions. |
| Type | The type of the purchase order. |
| Order no. | The unique reference number of the purchase order. |
| Date | The date the purchase order was created. |
Customer/ supplier |
The number of the customer/supplier to/from which the items are sold/purchased. |
| Account name | The name of the customer/supplier. |
| Order qty. | The total quantity of the item that has been ordered, expressed in the unit of measure of the purchase order line. |
| Open qty. | The quantity of the ordered items yet to be received for the purchase order. |
| Order total | The total sum for the purchase order. |
| Currency | The currency of the purchase order. |
| Status | The status of the purchase order. |
| Line total | The total amount of the line. |
| Order description | The description of the sales or purchase order. |
| Column | Description |
|---|---|
| Invoicing number | The serial number of the invoice that is being assigned to the invoices of the project in order of the creation of the invoices in accordance with the numbering sequence specified in the Pro forma number series field in the Project accounting preferences (PM101000) window. |
| Pro forma date | The date of the pro forma invoice. |
| Pro forma ref. no. | The reference number of the pro forma invoice. |
| Pro forma net amount in base currency | The net amount of the pro forma invoice in the base currency. |
| Pro forma gross amount in base currency | The gross amount of the pro forma invoice in the base currency. |
| Pro forma customer currency | The customer currency of the pro forma invoice. |
| Pro forma gross amount in customer currency | The gross amount of the pro forma invoice in the customer currency. |
| Pro forma net amount in customer currency | The net amount of the pro forma invoice in the customer currency. |
| Description | The description provided for the pro forma invoice. |
| Status | The status of the pro forma invoice. |
| Invoice total | The total amount of the pro forma invoice. |
| Doc. type | The type of the customer ledger document. |
| Ref. no. customers | The reference to the customer ledger document. |
| Doc. date | The date of the customer ledger document. |
| Doc. status | The status of the customer ledger document. |
| Doc. description | The description of the customer ledger document. |
| Doc. amount | The total amount of the customer ledger document. |
| Currency | The currency of the invoice. |
| Open CL balance | The current open balance of the invoice. |
| Customer doc. net amount | The net amount of the customer document. |
| Open balance in currency | The open balance of the invoice in currency. |
| Column | Description |
|---|---|
| Supplier | The ID of the supplier of the invoice assigned to the project. |
| Supplier name | The name of the supplier. |
| Supplier ref. | The supplier reference on the connected supplier document. |
| Invoice no. | The invoice number of the supplier document. |
| Description | The description of the supplier document. |
| Date | The date of the supplier document. |
| Type | The type of supplier document. |
| Amount | The amount of the document. |
| Status | The status of the document. |
| Gross amount | The gross amount of the document. |
| Net amount | The net amount of the document. |
| Open balance | The open balance of the document. |
| Currency | The currency of the document. |
| Open balance in currency | The open balance of the document in currency. |
| Column | Description |
|---|---|
| Ref. no | The reference number of the change order. |
| Class | The class of the change order, which is defined in the Change order classes (PM203000) window. |
| Revenue change no. | The number of the change order that affect the project revenue within the project, which the system uses for printing. The Revenue change no. is an integer that the system assigns sequentially, starting from 1 and then 2, 3, and so on. The last assigned number for the change orders of the project is shown in the Last revenue change no. field in the Project properties section of the Summary tab of this window. |
| Status | The status of the change order, which can be one of the following:
|
| Description | The description provided for the change order. |
| Change date | The date on which the changes made with the change order should be recorded in the project balances. |
| Approval date | The date that is communicated to the customer as the approval date of the agreed-upon changes. |
| External reference no | The external reference number of the change order. |
| Revenue budget change total | The total amount of the changes of the change order to the revenue budget of the project, which is the total of the Amount column on the Revenue budget tab of the Change orders (PM308000) window. |
| Commitments change total | The total amount of the changes of the change order to the commitments of the project, which is the total of the Amount in base currency column on the Commitments tab of the Change orders (PM308000) window. |
| Cost budget change total | The total amount of the changes of the change order to the cost budget of the project, which is the total of the Amount column on the Cost budget tab of the Change orders (PM308000) window. |
| Reverse status | The reverse status of the change order, which can be one of the following:
|
| Orig. CO ref. no | The reference number of the original change order that the current change order reverses. |
| Button | Description |
|---|---|
| Add task | Opens the Task (CR306020) window in a pop-up window; you can use the window to create a new task associated with the project. |
| Add event | Opens the Event (CR306030) window in a pop-up window; you can use the window to create a new event associated with the project. |
| Add email | Opens the Send (CR306015) window in a pop-up window; you can use the window to create and send an email associated with the project. |
| Add activity | Includes the following predefined menu commands:
|
| Column | Description |
|---|---|
| Type | The type of the activity. |
| Summary | The description provided for the activity. Click the link in this column for a specific activity to open the activity in a pop-up window. |
| Status | The status of the activity. |
| Start date | The start date and time of the activity. |
| Category | The category of the activity. |
| Invoiceable | A check box that indicates (if selected) that the time spent on the activity is invoiceable. |
| Time spent | The total time spent on the activity. |
| Overtime | The time in excess of normal work hours spent on the activity. |
| Invoiceable time | The number of invoiceable hours spent on the activity. |
| Invoiceable overtime | The invoiceable time in excess of normal work hours spent on the activity. |
| Work group | The work group to which the activity is assigned. |
| Owner | The employee to whom the activity is assigned. |
| Created by | The user who has created the activity. |
| Project | The project connected with the activity. |
| Project task | The project task connected with the activity. |
| Released | This check box is selected if the activity has been released. |
| Column | Description |
|---|---|
| Employee ID | The ID of the employee assigned to the project. |
| Employee name | The name of the employee assigned to the project. |
| Department | The department of the employee. |
| Type of hour | The hour type determines the labour cost of this employee with respect to the current project. You can create a new hour type by using the Type of hours (EP102000) window. |
| Description | The description of the earning type. |
| Labour item | The non-stock item of the Labour type used to account for the labour effort of the employee for this project. |
| Default price | The price associated with the labour item by default. |
| Element | Description |
|---|---|
| Default account | The account to be used as one of the sources of possible accounts for the invoices and transactions for the project. This account is used as the expense account in project transactions if the Project option is selected in the Expense account source field in the Invoicing rules (PM207000) window. This account is also used as the sales account for the invoice lines generated for the project by the invoicing rule with the Project selected in the Use sales account from field in the Invoicing rules (PM207000) window. |
| Default subaccount | The subaccount to be used as one of the sources of possible segment values for subaccounts to be used in the invoices and transactions for the project. This subaccount is used as a source of segment values (to be used for project transactions) for the segments with the P option selected in the Expense sub. source field in the Project accounting preferences (PM101000) window. This subaccount is also used as a source of segment values for the sales subaccount for the invoice lines generated for the project by the invoicing rule with the P mask specified in the Sales subaccount mask field in the Invoicing rules (PM207000) window. |
| Accrual account | The default accrual account to be used in project transactions for the project; also, this account is used as the default expense accrual account for transactions if the Project accrual option is selected in the Expense accrual account source field in the Project accounting preferences (PM101000) window. |
| Accrual subaccount | The default accrual subaccount to be used in project transactions for the project; also, this subaccount is used as a source of segment values for the expense accrual subaccount (to be used for project transactions) for the segments with the P option selected in the Expense accrual sub. source field in the Project accounting preferences (PM101000) window. |
| Column | Description |
|---|---|
| Account | The General ledger account that may appear in a transaction that is automatically added by the system to the documents associated with this project. |
| Default task | The task of this project to be associated with the account. |
| Column | Description |
|---|---|
| Attribute | The attribute used for the project. |
| Required | A check box that indicates (if selected) that this attribute is required for the project. |
| Value | The value of the attribute for the project. |
| Column | Description |
|---|---|
| Mailing ID | The unique ID of the mailing. |
| Branch | The branch of your company with which this mailing is associated. |
| Email account | The email account to be used for as the sender of emails for this mailing. If no account is specified, the default email account, which is defined in the Email preferences (SM204001) window, will be used. |
| Report | The report to be used by default for printing an invoice for the project and as the body or attachment of the email. The report you select here must be a report in the Projects workspace |
| Notification template | The email template, which is defined in the Notification templates (SM204003) window, to be used by default to generate personalised emails for this mailing, if a template is used rather than a report. |
| Format | The format in which the report (if applicable) will be sent by default if no preferences have been specified for a particular recipient in the Customers (AR303000) window (for customer contacts). Select one of the following options: HTML, Excel, or PDF. |
| Active | When this check box is selected, this mailing is active. Emails will be generated only for active mailings. For the PROFORMA mailing, you cannot clear this check box. |
| Column | Description |
|---|---|
| Contact type | The type of contact to receive emails:
|
| Contact ID | The specific contact. A particular recipient can be selected only if you have selected Employee or Contact as the Contact type. The selected employee or contact will receive the emails. |
| The email address associated with the contact. | |
| Format | The format in which the report (if applicable) will be sent to recipients. Select one of the following options: HTML, Excel, or PDF. |
| Active | A check box that indicates (if selected) that the contact is active. Only active recipients receive the emails generated for this mailing. |
| Bcc | A check box that indicates (if selected) that the contact will receive a bcc of the emails. |
| Element | Description |
|---|---|
| View notification feedback | Opens the Webhook notification feedback window where the message from the third-party integrator is visible. |
| Resend notification | Is used to resend the notification. |
| Column | Description |
|---|---|
| Success | Indicates if the message has been sent successfully or not. |
| Event | Represents the event category indicating if an entity has been created or updated. |
| Status | Indicates the status of the message. If the source is Visma Net, the status can be sent or resent. If the source is an API, the status is available meaning it is ready to be sent to third party integrators. If the source is Third party-integrators, the status is Consumed meaning that the customer confirms receiving the message. |
| Source | Indicates the source of the event: VNE, API, or Third Party-Integrators. |
| User | Indicates which user made a change to the entity. |
| Date | Indicates the date when the change was made. |
| Message | Indicates the detailed message identifier that has been sent. |
| Element | Description |
|---|---|
| Transaction number series | The system uses this number to automatically assign reference numbers to project-related transactions. |
| Batch number series | The system uses this number to assign reference numbers to project-related batches. |
| Pro forma number series | The number series the system uses to assign reference numbers to pro forma invoices. |
| Non-project code | The project ID that indicates that a specific transaction or task is not related to any project. The default value is X. When the Projects workspace is integrated with other modules, data entry windows in those modules include the Project column, where the user must specify the project associated with the transaction. You must enter the non-project code specified here if a transaction is not associated with any project. |
| Empty item code | The code to be specified as the Item ID to indicate that no specific item is associated with a project transaction, commitment, budget line of a project, or pro forma invoice line. In the Projects workspace, if a window includes the mandatory Item ID column where the user must specify an item, the system automatically populates this column with the empty item code, which the user can replace with the identifier of a particular item. The default empty item code is <N/A>; you can specify a different code if needed. The default UoM of the empty item code is HOUR. In the windows of the Projects workspace, when the empty item code is selected as the Item ID, you can select any other UoM instead of HOUR. The empty item code is treated as a real item in the Projects workspace, which gives users the opportunity to use this value in inquiries filtered by item, or to filter the rows in the windows of the Projects workspace by the empty item code you specify. In other workspaces, the empty item code is not supported and treated as NULL. For example, if a pro forma invoice has lines with the empty item code selected as the Item ID in the Pro forma invoices (PM307000) window, when the pro forma invoice is released, the system creates a sales invoice that has an empty Item ID setting in the corresponding lines in the Sales invoices (AR301000) window. |
| Invoiceable cut-off date | In the Run project invoicing (PM503000) window, you have specified an Invoice date. Now, you can choose whether you want to include or exclude the transactions that are created on the invoice date for the automatic invoices. Select one of the following options:
|
| Validate revenue budget limits for time and material | Defines how the system validates the limits of the revenue budget of a project when you process pro forma invoices for the project. You can select one of the following options:
|
| Cost budget update | The way the system updates the cost budget of projects with cost transactions. When a cost transaction is posted to the Projects workspace, the system updates the corresponding project with this transaction. If the cost budget of the project has a line with the same project task, account group, and item, the system updates the actual quantity and actual amount of this line on the Cost budget tab of the Projects (PM301000) window with the quantity and amount of the transaction, respectively. Otherwise, the system adds a new cost budget line. The account group is the group to which the expense account updated by the transaction is mapped. The item is the item of the cost transaction or the empty item code based on the option selected in the Cost budget update field. You can select one of the following options:
|
| Automatically post on release | A check box that determines whether project transactions will be automatically posted to General ledger once they are released. |
| Automatically release allocations | A check box that indicates whether Projects allocation transactions will be automatically released when generated. If you do not select this check box, you will be able to release the project allocation transactions manually by using the Release transactions (PM501000) window. |
| Internal cost commitment tracking | If you select this check box,, purchase orders are tracked by project as cost commitment. |
| Internal revenue commitment tracking | If you select this check box, sales orders are tracked by project as revenue commitment. |
| Option | Description |
|---|---|
| General ledger | A check box that indicates whether transactions in the General ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in general ledger documents, and the release of these documents will automatically update the project data. |
| Supplier ledger | A check box that indicates whether transactions in the Supplier ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in supplier ledger documents, and the release of these documents will automatically update the project data. |
| Customer ledger | A check box that indicates whether transactions in the Customer ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in customer ledger documents, and the release of these documents will automatically update the project data. |
| Sales | A check box that indicates whether transactions in the Sales workspace can be associated with the project based on this template. If you select this check box, users can select the project in sales documents, and the release of these documents will automatically update the project data. |
| Purchases | A check box that indicates whether transactions in the Purchases workspace can be associated with the project based on this template. If you select this check box, users can select the project in purchase documents, and the release of these documents will automatically update the project data. |
| Inventory | A check box that indicates whether transactions in the Inventory workspace can be associated with the project based on this template. If you select this check box, users can select the project in inventory documents, and the release of these documents will automatically update the project data. |
| Cash management | A check box that indicates whether transactions in the Cash management workspace can be associated with the project based on this template. If you select this option, users can select the associated project and task when they enter a document in the Cash management workspace. |
| Time entries | A check box that indicates whether the transactions in the Time and expenses workspace can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Expenses | A check box that indicates whether transactions from Expense can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Restrict available projects in customer ledger | Select where the project selection list will be restricted, either for all projects or projects with a customer (in the customer ledger only). |
| Element | Description |
|---|---|
| Expense account source | The source of the account for the debit side of the project transactions: The following options are available:
|
| Expense sub. source | The subaccount mask that defines the rule of selecting segment values for the expense subaccount to be used for project transactions. For a segment, the character designating the needed option is repeated as many times as there are characters in the segment. To set up the rule, select a segment, press F3, and select a source of the segment value, which is one of the following options:
This element is available only if the Subaccounts functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Expense accrual account source | The source of the account for the credit side of the project transaction to be generated on release of the time cards. The following options are available:
|
| Expense accrual sub. source | The subaccount mask that defines the rule of selecting segment values for the expense accrual subaccount to be used for the Projects transactions generated on release of time cards. For a segment, the character designating the needed option is repeated as many times as there are characters in the segment. To set up the rule, select a segment, press F3, and select the source of the segment value, which is one of the following options:
This element is available only if the Subaccounts functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Column | Description |
|---|---|
| Mailing ID | The unique identifier of the mailing. Visma Net provides two predefined system mailings:
|
| Default email account | The system email account to be used by default for sending emails for this mailing. If no account is specified, the default system account will be used. |
| Report ID | The report of the Projects workspace to be used by default for printing and also as the body or attachment of the email, if a report is used rather than an email template. By default, the following reports are used for the predefined system mailings:
|
| Notification template | The email template to be used by default to generate personalised emails for this mailing, if a template is used rather than a report. This template is defined in the Notification templates (SM204003) window. |
| Format | The format in which the report (if applicable) will be sent by default if no preferences have been specified for a particular recipient. Select one of the following options: HTML, Excel, or PDF. |
| Active | A check box that indicates (if selected) that this mailing is active. Emails can be generated only for active mailings. For the PROFORMA mailing, this check box is automatically selected and cannot be cleared. |
| Column | Description |
|---|---|
| Contact type | The type of contact to receive emails:
|
| Contact ID | The specific contact. A particular recipient can be selected only if you have selected Employee as the Contact type. |
| Format | The format in which the report (if applicable) will be sent to recipients of this type. Select one of the following options: HTML, Excel, or PDF. |
| Active | A check box that indicates (if selected) that the contact of this type is active. Only active recipients receive the emails generated for this mailing. |
| BCC | A check box that indicates (if selected) that the contact of this type will receive a blind carbon copy (BCC) of the emails. |
| Element | Description |
|---|---|
| Name | The entity type for which you want to specify the attribute group. The following options are available:
|
| Column | Description |
|---|---|
| Active | A check box that indicates (if selected) that the attribute is available for all records of a particular type. You can deactivate an obsolete attribute by clearing the check box. |
| Attribute ID | The attribute ID. |
| Description | A read-only field showing the description that has been provided for the attribute. |
| Sort order | An integer that defines the position of the attribute in the list of attributes available for the entity type. You should specify 1 for the first attribute you want to be listed, 2 for the second, and so on. |
| Required | A check box that indicates (if selected) that the user must specify a value for this attribute in the appropriate data entry window. |
| Control type | A read-only box displaying the element type of the attribute: Text, Combo, Check box, or Date-time. |
| Element | Description |
|---|---|
| View project (button) | Opens the Projects (PM301000) window, where you can view the details of a project you select. |
| From project | The ID of the project you want to start your selection from. |
| To project | The ID of the project to you want to end your selection at. |
| Project manager | The project manager of the projects you want view in the table. |
| Customer | The customer connected to the projects you want view in the table. |
| Start date | The start date of the range of projects you want to view in the table. |
| End date | The end date of the range of projects you want to view in the table. |
| Account group | The account group of the projects you want to view in the table. |
| Status | The status of the projects that you want to view in the table. |
| Element | Description |
|---|---|
| Project | The ID of the project. |
| Project name | The name of the project. |
| Customer | The name of the customer of the project. |
| Customer no. | The number of the customer of the project. |
| Account group | The name of the account group of the project. |
| Account group ID | The ID of the account group of the project. |
| Current budget amount | The current budget amount of the project. |
| Actual amount | The actual amount of the project. |
| Difference | The difference between the current budget amount and the actual amount. |
| Performance | The performance of the project. |
| Status | The status of the project. |
| Element | Description |
|---|---|
| View transactions | Opens the Project transactions (PM304000) window in a pop-up window. This window shows the list of project transactions that correspond to the selected budget line. |
| View commitment details | Opens the Commitments (PM306000) window in a pop-up window. This window shows the list of commitments that correspond to the selected budget line. This button appears if at least one of the following check boxes is selected in the Project accounting preferences (PM101000) window: Internal cost commitment tracking or Revenue commitment tracking. |
| Element | Description |
|---|---|
| Project | The identifier of the project. |
| Project task | The identifier of a project task. If you select a project that has the default project task, this task is automatically populated in the column. |
| Item ID | The item that is associated with the budget line. By default, the system populates this column with the empty item code, which is initially N/A and can be changed in the Empty item code field in the Project accounting preferences (PM101000) window. |
| Cost code | The cost code that is associated with the budget line. You can change the cost code value for each line. The column is shown if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Account group | The account group of the budget line. |
| Description | The detailed description of the budget line. |
| UoM | The unit of measure of the budget line. If a stock item is selected in the Item ID column, the UoM column is automatically filled in with the base unit of measure of this stock item, which can be changed to another UoM available for the item. |
| Original budgeted quantity | The budgeted quantity of the budget line. |
| Unit rate | The price of the specified unit of the budget line. |
| Original budgeted amount | The budgeted amount of the budget line. For the original budgeted quantity, UoM, and unit rate specified for the line, the amount is calculated as Original budgeted amount = Original budgeted quantity * Unit rate. |
| Revised budgeted quantity | If the Change order workflow check box is cleared for the project on the Summary tab of the Projects (PM301000) window, you can change the quantity manually. |
| Revised budgeted amount | The revised budgeted amount if the original budget amount has been revised for the project after the initial budgeting. By default, this amount is equal to the Original budgeted amount value specified for the line. |
| Revised committed quantity | The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. This column appears if at least one of the following check boxes is selected in the Project accounting preferences (PM101000) window: Internal cost commitment tracking or Revenue commitment tracking. |
| Revised committed amount | The total amount of commitments that are associated with the project, project task, and account group. This column appears if at least one of the following check boxes is selected in the Project accounting preferences (PM101000) window: Internal cost commitment tracking or Revenue commitment tracking. |
| Committed revised quantity) | The total received quantity of the commitments that are associated with the project, project task, and account group. This column appears if at least one of the following check boxes is selected in the Project accounting preferences (PM101000) window: Internal cost commitment tracking or Revenue commitment tracking. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed invoiced quantity | The total invoiced quantity of the commitments that are associated with the project, project task, and account group. This column appears if at least one of the following check boxes is selected in the Project accounting preferences (PM101000) window: Internal cost commitment tracking or Revenue commitment tracking. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed invoiced amount | The total invoiced amount of the commitments that are associated with the project, project task, and account group. This column appears if at least one of the following check boxes is selected in the Project accounting preferences (PM101000) window: Internal cost commitment tracking or Revenue commitment tracking. |
| Committed open quantity | The total open quantity of the commitments that are associated with the project, project task, and account group. This column appears if at least one of the following check boxes is selected in the Project accounting preferences (PM101000) window: Internal cost commitment tracking or Revenue commitment tracking. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Committed open amount | The total open amount of the commitments that are associated with the project, project task, and account group. This column appears only if at least one of the following check boxes is selected in the Project accounting preferences (PM101000) window: Internal cost commitment tracking or Revenue commitment tracking. |
| Actual quantity | The total quantity of the lines of the released customer invoices that correspond to the budget line. The quantity is updated only if the UoM is specified in the budget line and if the system can convert the UoM of the document line to the UoM of the budget line by using the list of unit conversions defined in the Units of measure (CS203100) window. |
| Actual amount | The total amount of the lines of the released customer invoices that correspond to the budget line. |
| Type | The type of the account group of the budget line that can be one of the following:
|
| Element | Description |
|---|---|
| View project (button) | Opens the Projects (PM301000) window, where you can view the details of a project you select. |
| From project | The ID of the project you want to start your selection from. |
| To project | The ID of the project to you want to end your selection at. |
| Project manager | The project manager of the projects you want view in the table. |
| Customer | The customer connected to the projects you want view in the table. |
| Start date | The start date of the range of projects you want to view. |
| End date | The end date of the range of projects you want to view. |
| Status | The status of the projects that you want to view in the table. |
| Column | Description |
|---|---|
| Project ID | The ID of the project. |
| Project name | The name of the project. |
| Project manager | The manager of the project. |
| Completed (%) | The percentage of the project that has been completed. |
| Start date | The start date of the project. |
| End date | The end date of the project. |
| Customer | The customer of the project. |
| Currency | The currency of the project. |
| Allocation rule | The allocation rule that applies to the project. |
| Status | The status of the project. |
| Element | Description |
|---|---|
| View project (button) | Opens the Projects (PM301000) window, where you can view the details of a project you select. |
| From project | The ID of the project you want to start your selection from. |
| To project | The ID of the project to you want to end your selection at. |
| Project manager | Use this field to filter projects belonging to a specific project manager. |
| Customer | Use this field to filter projects belonging to a specific customer. |
| Start date | The start date of the project. To change the date, you can either type a specific date into the date field, or select it by using the calendar. |
| End date | The end date of the project. To change the date, you can either type a specific date into the date field, or select it by using the calendar. |
| Status | The status of the projects that you want to view in the table:
|
| Element | Description |
|---|---|
| Project ID | The ID of the project. |
| Project name | The name of the project. |
| Budget revenue | The budget revenue of the project. |
| Actual revenue | The actual revenue of the project. |
| Budget cost | The budget cost of the project. |
| Actual cost | The actual cost of the project. |
| Net revenue | The net revenue of the project. |
| Gross margin (%) | The gross margin of the project, shown in percentage. |
| Element | Description |
|---|---|
| Project ID | The project to which the task is assigned. |
| Task ID | The unique identifier of the task. The structure of this identifier is defined by the PROTASK segmented key, whose configuration is defined in the Segment keys (CS202000) window. |
| Description | A detailed description of the task. |
| Status | The status of the project task, which can be one of the following:
|
| Default | If this check box is selected, the project task has been set as the default. |
| Element | Description |
|---|---|
| Planned start date | The date when the task is expected to start. |
| Planned end date | The date when the task is expected to end. |
| Start date | The actual start date of the task. When the status of the project task is changed to Active, the system automatically specifies the current business date as the task’s start date. |
| End date | The actual end date of the task. When the status of the task is changed to Completed, the system automatically specifies this date as the current business date. |
| Completion method | The method of calculating the percentage of completion of the task. The following options are available:
For more information, see: About the calculation of task completion percentage |
| Completed (%) | The actual percentage of task completion, which is determined as follows:
The value is set to 100 once the task is completed. The completion percentage is used in revenue allocations for the project. For more information, see: About labour and revenue allocation |
| Approver | The employee who is authorised to approve the time activities related to this project task. |
| Restrict employees | A check box that (if selected) indicates that only the employees listed on the Employees tab of this window can create activities and documents associated with the current project task. |
| Element | Description |
|---|---|
| Invoice separately | A check box that indicates (if selected) that the task should be invoiced by a separate invoice. |
| Customer | The customer associated with the task. |
| Location | The customer location associated with the task. This element is available if the Business account locations functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Allocation rule | The allocation rule to be used for this project task. |
| Invoicing rule | The rule that the system uses to run invoicing for the task. |
| Branch | The branch of your company with which this task is associated. |
| Rate table | The rate table to be used for this project task. |
| Invoicing option | The way the task becomes eligible for invoicing. You can select one of the following options:
|
| WIP account group | The work-in-progress account group associated with the task. |
| Element | Description |
|---|---|
| Default account | The account to be used as one of the sources of possible accounts for the invoices and transactions for the task. |
| Default subaccount | The subaccount to be used as one of the sources of possible segment values for subaccounts to be used in the invoices and transactions for the task. |
| Accrual account | The account to be used as an expense accrual account in the transactions that are generated for the task. |
| Accrual subaccount | The subaccount to be used as an expense accrual subaccount in the transactions that are generated for the task. |
| VAT category | The VAT category (if applicable) to be used as the default VAT category for the task. |
| Option | Description |
|---|---|
| General ledger | A check box that indicates whether transactions in the General ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in general ledger documents, and the release of these documents will automatically update the project data. |
| Supplier ledger | A check box that indicates whether transactions in the Supplier ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in supplier ledger documents, and the release of these documents will automatically update the project data. |
| Customer ledger | A check box that indicates whether transactions in the Customer ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in customer ledger documents, and the release of these documents will automatically update the project data. |
| Sales | A check box that indicates whether transactions in the Sales workspace can be associated with the project based on this template. If you select this check box, users can select the project in sales documents, and the release of these documents will automatically update the project data. |
| Purchases | A check box that indicates whether transactions in the Purchases workspace can be associated with the project based on this template. If you select this check box, users can select the project in purchase documents, and the release of these documents will automatically update the project data. |
| Inventory | A check box that indicates whether transactions in the Inventory workspace can be associated with the project based on this template. If you select this check box, users can select the project in inventory documents, and the release of these documents will automatically update the project data. |
| Cash management | A check box that indicates whether transactions in the Cash management workspace can be associated with the project based on this template. If you select this option, users can select the associated project and task when they enter a document in the Cash management workspace. |
| Time entries | A check box that indicates whether the transactions in the Time and expenses workspace can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Expenses | A check box that indicates whether transactions from Expense can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Column | Description |
|---|---|
| Non-stock item | The non-stock item that designates a service or labour associated with the task. |
| Description | The description of the service or labour associated with the task. |
| Item fee | The flat price for the service or labour. |
| Account source | The source of the account for the invoicing transactions, which can be one of the following:
|
| Subaccount mask | The rule for selecting segment values for the subaccount to be used for recurring invoicing transactions. To set up the rule for selecting segment values, select a segment, press F3, and select a source of the segment value, which is one of the following options:
|
| Account | The account to be used in the invoicing transaction if the account source is set to Task. |
| Subaccount | The subaccount to be used in the invoicing transaction if the subaccount mask uses T. |
| Reset usage | The setting that indicates whether the system resets the quantity of the service or labour, which is specified as the Included value, when invoicing is performed. You can select one of the following options:
|
| Included | The quantity of the service or labour that you plan to provide when executing this task. |
| UoM | The unit of measure used for the service or labour. |
| Used | The quantity of the service or labour that was actually provided to the customer when this task was executed. If you select On invoicing as the Reset usage, the value in this column resets to zero each time you run the invoicing procedure. |
| Element | Description |
|---|---|
| Add task | Opens the Task (CR306020) window in a pop-up window so you can create a new task associated with the project. |
| Add event | Opens the Event (CR306030) window in a pop-up window so you can create a new event associated with the project. |
| Add email | Opens the Send (CR306015) window in a pop-up window so you can create and send an email associated with the project. |
| Add activity | Includes the following menu commands:
If you added activities to the project task that is in the In planning status, any related transactions cannot be released until the project task status changes to Active. |
| Type | The type of activity: Event, Task, Email, or Activity. |
| Summary | The description provided for the activity. Click the Summary column of a specific activity to open the activity in a separate dialog box. |
| Status | The status of the activity. |
| Start date | The start date and time of the activity. |
| Category | The category of the activity. |
| Invoiceable | A check box indicating whether the time spent on the activity is invoice able. |
| Time spent | The total time spent on the activity. |
| Overtime | The time in excess of normal work hours spent on the activity. |
| Invoiceable time | The number of invoiceable hours spent on the activity. |
| Invoiceable overtime | The number of invoiceable hours spent on the activity in excess of normal work hours. |
| Work group | The work group to which the activity is assigned. |
| Owner | The employee to whom the activity is assigned. |
| Element | Description |
|---|---|
| Attribute | The attribute used for the task. |
| Required | A check box that indicates (if selected) that this attribute is required for the project task. |
| Value | The value of the attribute for the task. |
| Element | Description |
|---|---|
| Employee ID | The identifier of the employee assigned to the project task. |
| Employee name | The name of the employee assigned to the project task. |
| Department | The department of the employee. |
| Element | Description |
|---|---|
| View project (button) | Opens the Projects (PM301000) window, where you can view the details of a project you select. |
| Type | The type of projects you want to view in the table. |
| From project | The ID of the project you want to start your selection from. |
| To project | The ID of the project to you want to end your selection at. |
| Project manager | The project manager of the projects you want view in the table. |
| Customer | The customer connected to the projects you want view in the table. |
| Start date | The start date of the range of projects you want to view. |
| End date | The end date of the range of projects you want to view. |
| Status | The status of the projects that you want to view in the table. |
| Column | Description |
|---|---|
| Project ID | The ID of the project. |
| Project name | The name of the project. |
| Task ID | The task ID of the project task. |
| Description | The description of the project. |
| Type | The type of the project. |
| Status | The status of the project. |
| Allocation rule | The allocation rule that applies to the project. |
| Invoicing option | The invoicing option applied to the project. |
| Start date | The start date of the project. |
| End date | The end date of the project. |
| Completed (%) | The percentage of the project that has been completed. |
| Current budget amount | The current budget amount of the project. |
| Actual amount | The actual amount of the project. |
| Expected amount | The expected amount of the project. |
| Actual vs. expected amount % | The actual versus the expected amount of the project in %. |
| Element | Description |
|---|---|
| Template ID | The identifier of the project template to be associated with the task. Select one of the project templates defined in your system. |
| Task ID | The unique identifier of the template task. The structure of this identifier is defined by the PROTASK segmented key, which was configured in the Segment keys (CS202000) window. |
| Description | The description of the template task. |
| Default | If this check box is selected, the project task has been set as the default. |
| Element | Description |
|---|---|
| Automatically include in project | A check box that (if selected) indicates that the system should include this template task in any project created by using the associated project template. |
| Completion method | The method of calculating the percentage of completion for tasks based on this task template. The following options are available:
For more information, see: About the calculation of task completion percentage |
| Approver | The employee who is authorised to approve all task activities for tasks based on this task template. |
| Element | Description |
|---|---|
| Invoice separately | A check box that indicates (if selected) that the tasks created based on this template task are being invoiced by a separate invoice. |
| Allocation rule | The rule that Visma Net uses to run allocation for the tasks created based on this template task. |
| Invoicing rule | The rule that Visma Net uses to run invoicing for the tasks created based on this template task. |
| Branch | The branch of your company with which the tasks created based on this template task are associated. |
| Rate table | The rate table to be used for the tasks created based on this template task. |
| Invoicing option | The way the task becomes eligible for invoicing. You can select one of the following options:
|
| Work un progress account group | The work-in-progress account group associated with the tasks created based on this template task. |
| Element | Description |
|---|---|
| Default account | The account to be used as one of the sources of possible accounts for the invoices and transactions for the task based on this task template. |
| Default subaccount | The subaccount to be used as one of the sources of possible segment values for subaccounts to be used in the invoices and transactions for the task based on this task template. |
| Accrual account | The account to be used as an expense accrual account in transactions generated for the task based on this task template. |
| Accrual subaccount | The subaccount to be used as an expense accrual subaccount in transactions generated for the task based on this task template. |
| VAT category | The VAT category (if applicable) to be used as the default VAT category for the task based on this template task. |
| Element | Description |
|---|---|
| General ledger | A check box that indicates whether transactions in the General ledger workspace can be associated with tasks created by using this template task. With this check box selected, users can select the task in general ledger documents, and the release of these documents automatically updates the project data. |
| Supplier ledger | A check box that indicates whether transactions in the Supplier ledger workspace can be associated with tasks created by using this template task. With this check box selected, users can select the task in supplier ledger documents, and the release of these documents automatically updates the project data. |
| Customer ledger | A check box that indicates whether transactions in the Customer ledger workspace can be associated with tasks created by using this template task. With this check box selected, users can select the task in customer ledger documents, and the release of these documents automatically updates the project data. |
| Sales | A check box that indicates whether transactions in the Sales workspace can be associated with tasks created by using this template task. With this check box selected, users can select the task in sales documents, and the release of these documents automatically updates the project data. |
| Purchases | A check box that indicates whether transactions in the Purchases workspace can be associated with tasks created by using this template task. With this check box selected, users can select the task in purchase documents, and the release of these documents automatically updates the project data. |
| Inventory | A check box that indicates whether transactions in the Inventory workspace can be associated with tasks created by using this template task. With this check box selected, users can select the task in inventory documents, and the release of these documents automatically updates the project data. |
| Cash management | A check box that indicates whether transactions in the Cash management workspace can be associated with tasks created by using this template task. With this check box selected, users can select the task in cash management, and the release of these documents automatically updates the project data. |
| Time entries | A check box that indicates whether the transactions of the Employee time card (EP305000) and Employee time activities (EP307000) windows (in the Time and expenses s workspace) can be associated with the task based on this template. If you select this check box, users can select the task in documents, and the release of these documents automatically updates the task data. |
| Expenses | A check box that indicates whether transactions from Expense can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Column | Description |
|---|---|
| Non-stock item | The non-stock item that designates the service or labour that is associated with the task created by using this template task. |
| Description | The description of the service or labour that is associated with the task created by using this template task. |
| Item fee | The flat price for the service or labour. |
| Account source | The source of the account for the invoicing transactions, which can be one of the following:
|
| Subaccount mask | The rule for selecting segment values for the subaccount to be used for recurring invoicing transactions. To set up the rule for selecting segment values, select a segment, press F3, and select a source of the segment value, which is one of the following options:
|
| Account | The account to be used in the invoicing transaction if the account source is set to Task. |
| Subaccount | The subaccount to be used in the invoicing transaction if the subaccount mask uses T. |
| Reset usage | The setting that indicates whether the system resets the quantity of the service or labour, which is specified as the Included value, when invoicing is performed. You can select one of the following options:
|
| Included | The quantity of the service or labour that is included in invoicing period. If the quantity of service or labour provided to customer exceeds this value for the current invoicing period, all extra quantity is charged at the regular rate. |
| UoM | The unit of measure used for the service or labour. |
| Column | Description |
|---|---|
| Attribute | The attribute ID. |
| Required | A check box that you select to indicate that this is a mandatory attribute. |
| Value | The value of the attribute for this template task. |
| Element | Description |
|---|---|
| Template ID | The unique identifier for the project template. The structure of this identifier is defined by the PROJECT segmented key, which was configured using the Segment keys (CS202000) window. |
| Status | The status of the project template. You can select one of the following options:
|
| Description | A detailed description of the template. |
| Element | Description |
|---|---|
| Revenue budget level | The detail level of the revenue budget for the projects created by using this template: options:
|
| Project manager | The person who is responsible for managing the project and authorised to approve the project task and task activities (for projects based on this template). |
| Restrict employees | A check box that you select to allow time cards to be associated with the current project only if the employee is listed on the Employees tab. |
| Webhook notifications | A check box which (if selected) indicates that the system will send a notification when a project is created or updated. An update can consist of changes made to the following tabs: Summary, Employee, Tasks. |
| Element | Description |
|---|---|
| Invoicing period | The frequency of invoicing in the projects based on this template, which can be one of the following options:
|
| Terms | The type of credit terms used for invoices of the project created based on this template. Credit terms are defined in the Credit terms (CS206500) window. |
| Allocation rule | The rule that Visma Net uses to run the allocation of transactions for the projects created using this template. |
| Run allocation on release of project transactions | A check box that indicates (if selected) that allocation is run automatically during the release of the documents associated with the project. |
| Invoicing rule | The rule that Visma Net uses to run invoicing for the projects created by using this template. |
| Branch | The branch of your company with which the projects created by using this template will be associated. |
| Rate table | The rate table to be used for pricing. |
| Create pro forma at the time of invoicing | A check box that indicates (if selected) that pro forma invoices are created automatically when you run project invoicing for the projects created based on this template. |
| Use the revenue budget limits for the time and material | A check box that indicates (if selected) that the system will validate the limits of the revenue budget when you process pro forma invoices for the projects created based on this template. |
| Automatically release customer documents | A check box that indicates whether the system will automatically release invoice documents after invoicing is complete in Projects for the projects based on this template. |
| Option | Description |
|---|---|
| General ledger | A check box that indicates whether transactions in the General ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in general ledger documents, and the release of these documents will automatically update the project data. |
| Supplier ledger | A check box that indicates whether transactions in the Supplier ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in supplier ledger documents, and the release of these documents will automatically update the project data. |
| Customer ledger | A check box that indicates whether transactions in the Customer ledger workspace can be associated with the project based on this template. If you select this check box, users can select the project in customer ledger documents, and the release of these documents will automatically update the project data. |
| Sales | A check box that indicates whether transactions in the Sales workspace can be associated with the project based on this template. If you select this check box, users can select the project in sales documents, and the release of these documents will automatically update the project data. |
| Purchases | A check box that indicates whether transactions in the Purchases workspace can be associated with the project based on this template. If you select this check box, users can select the project in purchase documents, and the release of these documents will automatically update the project data. |
| Inventory | A check box that indicates whether transactions in the Inventory workspace can be associated with the project based on this template. If you select this check box, users can select the project in inventory documents, and the release of these documents will automatically update the project data. |
| Cash management | A check box that indicates whether transactions in the Cash management workspace can be associated with the project based on this template. If you select this option, users can select the associated project and task when they enter a document in the Cash management workspace. |
| Time entries | A check box that indicates whether the transactions in the Time and expenses workspace can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Expenses | A check box that indicates whether transactions from Expense can be associated with the task based on this template. If you select this check box, users can select the project in documents, and the release of these documents automatically updates the project data. |
| Column | Description |
|---|---|
| Set as default | Use this button to set a project task as the default for a project. |
| Task ID | The task template associated with the project template. |
| Description | The description of the task. |
| Rate table | The rate table to be used for pricing. |
| Allocation rule | The rule that is used to run allocation for the task. |
| Invoicing rule | The invoicing rule that is used to run invoicing for this project. |
| Invoicing option | The option that defines how the project task should be invoiced, which can be one of the following options: By invoicing period, On task completion, or On project completion. |
| VAT category | The VAT category (if applicable) of the task. |
| Default | This check box is automatically selected on the active line, when you click the Set as default button on the top part of the table. |
| Button | Description |
|---|---|
| Project task | A template task of the project template. |
| Item ID | A stock or non-stock item that is used for the time and material project invoicing. By default, the system populates this box with the empty item code (N/A), which is defined in the Empty item code field in the Project accounting preferences (PM101000) window. The column is shown if Task and item is selected as the Revenue budget level on the Summary tab of the template project. |
| Cost code | The cost code that is associated with a revenue budget line. You can change the cost code value for each revenue line. The column is shown if Task and cost code is selected as the Revenue budget level on the Summary tab of the window for the project. |
| Account group | The income account group of the revenue budget line. |
| Description | The description of the revenue budget line. |
| Budgeted quantity | The budgeted quantity of the revenue budget line. |
| UoM | The unit of measure of the revenue budget line. If an stock item is selected in the Item ID column, the UoM is automatically selected as the base unit of measure of this stock item and can be changed to another UoM available for the item. The base unit of measure of the empty item code ( N/A ) is HOUR. |
| Unit rate | The price of the specified unit of the revenue budget line. |
| Budgeted amount | The budgeted amount of the revenue budget line. For the Budgeted quantity, UoM, and Unit rate specified for the line, the amount is calculated as Budgeted amount = Budgeted quantity * Unit rate. |
| VAT category | The VAT category (if applied) for the revenue budget line. |
| Button | Description |
|---|---|
| Project task | A template task of the project template. |
| Item ID | The stock or non-stock item that is associated with the cost budget line. The column is shown if Task and item is selected as the Revenue budget level on the Summary tab of the window for the project. |
| Cost code | The cost code that is associated with the cost budget line. You can change the cost code value for each line. The column is shown if Task and cost code is selected as the Revenue budget level on the Summary tab of the window for the project. |
| Account group | The account group to which the corresponding expense account is mapped. |
| Description | The description of the cost budget line. |
| UoM | The unit of measure of the cost budget line. If an stock item is selected in the Item ID column, the UoM is automatically selected as the base unit of measure of this stock item and can be changed by another UoM available for the item. If the item is not specified ( N/A ), any existing UoM can be selected. |
| Unit rate | The price of the specified unit of the cost budget line. |
| Budgeted quantity | The budgeted quantity of the cost budget line. |
| Budgeted amount | The budgeted amount of the cost budget line. For the Budgeted quantity, UoM, and Unit rate specified for the line, the amount is calculated as Budgeted amount = Budgeted quantity * Unit rate. |
| Auto completed (%) | A check box that indicates (if selected) that the system automatically updates the Completed (%) percentage of the work on the tasks. |
| Revenue task | The task by which the revenue budget is specified for the cost budget line. |
| Revenue item | The item by which the revenue budget is specified for the cost budget line. The column is shown if Time and item is selected as the Revenue budget level on the Summary tab of the project template. |
| Element | Description |
|---|---|
| Employee ID | The identifier of the employee who will be assigned to the project created by using this template. |
| Employee name | The name of the employee who will be assigned to any project created by using this project template. |
| Department | The department of the employee who will be assigned to the project created by using this template. |
| Earning type | The earning type that determines how the labour of this employee is costed in projects based on this template. You can create a new earning type by using the Type of hours (EP102000) window. |
| Description | The description of the earning type. |
| Labour item | The labour-type non-stock item used to account for the labour effort of the employee in projects based on this template. |
| Default price | The price associated with the labour item by default. |
| Element | Description |
|---|---|
| Default account | The sales account to be used as one of the sources of possible accounts for the invoices and transactions for projects based on this template. |
| Default subaccount | The sales subaccount to be used as one of the sources of possible segment values for subaccounts to be used in the invoices and transactions for projects based on this template. |
| Accrual account | The optional account to be used as the debit account (instead of the expense accrual account associated with the Labour non-stock item) in transactions generated based on time cards for projects based on this template. |
| Accrual subaccount | The subaccount to be used as the debit subaccount (instead of the expense accrual subaccount associated with the labour non-stock item) in transactions generated based on time cards for projects based on this template. |
| Column | Description |
|---|---|
| Account | The general ledger account that may appear in a transaction automatically added by the system to the documents associated with the projects based on this template. |
| Default task | The task to be associated with the account that may appear in a transaction automatically generated by Visma Net. |
| Column | Description |
|---|---|
| Attribute | The attribute used for the project template. |
| Required | A check box that indicates (if selected) that this attribute is required for the project template. |
| Value | The value of the attribute for the project template. This value will be used as the default value of the attribute of projects based on this template, but it can be overridden. |
| Column | Description |
|---|---|
| Mailing ID | The unique identifier of the mailing. |
| Branch | The branch of your company with which this mailing is associated. |
| Email account | The email account to be used for sending emails for this mailing. If no account is specified, the default email account, which is defined in the Email preferences (SM204001) window, will be used. |
| Report | The report of the Projects module to be used by default for printing and also as the body or attachment of the email, if a report is used rather than an email template. |
| Notification template | The email template, which is defined in the Notification templates (SM204003) window, to be used by default to generate personalized emails for this mailing, if a template is used rather than a report. |
| Format | The format in which the report (if applicable) will be sent by default if no preferences have been specified for a particular recipient in the Customers (AR303000) window (for customer contacts). Select one of the following options: HTML, Excel, or PDF. |
| Active | A check box that indicates (if selected) that this mailing is active. Emails will be generated only for active mailings. For the PROFORMA mailing, you cannot clear this check box. |
| Column | Description |
|---|---|
| Contact type | The type of contact to receive emails:
|
| Contact ID | The specific contact. A particular recipient can be selected only if you have selected Employee or Contact as the Contact type. The employee or contact, if one is selected, will receive the emails of the customer. |
| Format | The format in which the report (if applicable) will be sent to recipients of this type. Select one of the following options: HTML, Excel, or PDF. |
| Active | A check box that indicates (if selected) that the contact of this type is active. Only active recipients receive the emails generated for this mailing. |
| Bcc | A check box that indicates (if selected) that the contact of this type will receive a blind carbon copy (BCC) of the emails. |
| Element | Description |
|---|---|
| Release | Releases the currently selected transaction. |
| Reverse allocation | Creates a new transaction that reverses (offsets) the currently selected transaction. |
| Element | Description |
|---|---|
| Workspace | The workspace where the transactions have originated. Select a workspace from the drop-down list, which includes Projects and all the workspaces for which the visibility option is selected in the Project accounting preferences (PM101000) window. |
| Ref. no. | The reference number of the transaction, which the system automatically assigns by using the number series specified in the Project accounting preferences (PM101000) window. |
| Status | The transaction status. The following statuses are possible:
|
| Description | The description provided for the transaction. |
| Total quantity | The total quantity of items in the transactions listed in the table. |
| Total invoiceable quantity | The total invoiceable quantity for the transactions listed in the table. |
| Total amount | The total amount for the transactions listed in the table. |
| Element | Description |
|---|---|
| Branch | The branch in which the transaction was created. |
| Project | The project associated with the transaction. |
| Project task | The project task associated with the transaction. |
| Cost code | The cost code associated with the transaction. The column is available if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Account group | The account group of the debit account of the transaction. |
| Employee | The employee associated with the transaction, such as the employee who worked on the project for the customer. |
| Customer/supplier | The name of the supplier (if the transaction originated in the Supplier ledger workspace) or customer (if the transaction originated in another workspace). |
| Location | The location of the customer or supplier. This column is available only if the Business account locations functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Item ID | The identifier of the item associated with the transaction. The item is the source of the expense accounts used for posting the transaction. |
| Description | The description provided for the transaction. |
| UoM | The unit of measure used to estimate the quantity for the transaction, such as HOUR or BOX. |
| Quantity | The quantity for the transaction, such as the number of service hours provided to the customer. |
| Invoiceable | A check box indicating whether the transaction is used in calculating the amount charged to the customer for the project task. |
| Invoiceable quantity | The quantity that is used for invoicing the customer. For instance: You can invoice the customer based on the hours of service you have provided to the customer. |
| Unit rate | The price of the item or the rate of the service. In the case of a labour item, the employee’s hourly rate is used as the unit rate. |
| Amount | The amount of the transaction. |
| Debit account | For released transactions, the account the transaction debited when it was released; for unreleased transactions, the account the transaction debits if it is released (mainly for the transactions that originate in the Projects workspace). |
| Debit subaccount | For released transactions, the subaccount the transaction debited when it was released; for unreleased transactions, the subaccount the transaction debits if it is released. |
| Credit account | For released transactions, the account the transaction credited when it was released; for unreleased transactions, the account the transaction credits if it is released. |
| Credit subaccount | For released transactions, the subaccount the transaction credited when it was released; for unreleased transactions, the subaccount the transaction credits if it is released. |
| Date | The date when the transaction was created. |
| Fin. period | The financial period associated with the transaction. |
| Batch no. | The batch number of the transaction in the General ledger workspace. |
| Earning type | The earning type specified for the transaction to calculate the labour cost. |
| Multiplier | The multiplier by which the unit rate is multiplied when the labour cost is calculated. The multiplier can differ from 1 only for earning types marked as overtime. |
| Use the quantity that can be invoiced in amount formula | A check box that you select if you want the system to use the invoiceable quantity (the Invoiceable quantity column) instead of the overall quantity (the Quantity column) of the transaction when calculating the amount of transaction. |
| Allocated | A check box that indicates whether the amounts of the transactions were allocated for the project. The transaction amount is allocated if this check box is selected; otherwise, the transaction amount is not allocated. |
| Released | A check box indicating whether the transaction has been released. |
| Element | Description |
|---|---|
| Project | The identifier of the project whose transactions you want to view. |
| Account group | The account group for which you want to view transactions. If you want to see transactions associated with all account groups, leave this field blank. |
| Project task | The project task for which you want to view transactions. If you want to see transactions associated with all tasks, leave this field blank. |
| Cost code | The cost code for which you want to view transactions. If you want to see transactions associated with all cost codes, leave this field blank. The field is available if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| Item ID | The stock item for which you want to view transactions. If you want to see transactions associated with all items, leave this field blank. |
| From | The starting date of the range for which you want to view transactions. If you want to see transactions for all dates, leave this field (and To ) blank. |
| To | The ending date of the range for which you want to view transactions. If you want to see transactions for all dates, leave this field (and From ) blank. |
| Employee | The employee for which you want to view transactions. If you want to see transactions associated with all employees, leave this field blank. |
| Show only allocation | A check box that you select to view only allocation transactions; any source transactions are not listed in the table. If you clear this check box, the table displays all transactions, including source transactions and allocation transactions. |
| Element | Description |
|---|---|
| Branch | The branch in which the transaction was created. |
| Workspace | The workspace where this transaction was created or released. |
| Ref. no. | The identifier of the transaction in Visma Net. |
| Project task | The project task associated with the transaction. |
| Date | The date the transaction was created. |
| Description | The detailed description provided for the transaction. |
| Item ID | The identifier of the stock or non-stock item associated with the transaction. |
| Cost code | The identifier of the cost code associated with the transaction. The column is available if the Cost code functionality is enabled in the Enable/disable functionalities (CS100000) window. |
| UoM | The unit of measure used for the transaction, such as HOUR or BOX. |
| Quantity | The quantity for the transaction, such as the number of service hours provided to the customer. |
| Invoiceable | When this check box is selected, the transaction is used to calculate the amount that will be charged to the customer. If this check box is not selected, the transaction does not affect the invoicing for the project. |
| Invoiceable quantity | The quantity that is used for invoicing the customer. For instance, you can invoice the customer based on the hours of service that your employees have provided to the customer. |
| Unit rate | The price of the item or the rate of the service. |
| Amount (reversed) | The amount of the transaction with the sign reversed (incomes and liabilities). |
| Amount (normal) | The amount of the transaction with the positive sign (expenses and assets). |
| Customer/supplier | The name of the supplier (if the transaction originated in the Supplier ledger workspace) or customer (if the transaction originated in another workspace). |
| Employee | The employee associated with the transaction, such as the employee who provided the labour or service to the customer. |
| Debit account group | The account group of the account to be debited in this transaction. |
| Debit account | For a released transaction, the account the transaction debited when it was released, and for an unreleased transaction, the account the transaction will debit if it is released. |
| Debit subaccount | For a released transaction, the subaccount the transaction debited when it was released, and for an unreleased transaction, the subaccount the transaction will debit if it is released. |
| Credit account group | The account group of the account to be credited in this transaction. |
| Credit account | For a released transaction, the account the transaction credited when it was released, and for an unreleased transaction, the account the transaction will credit when it is released. |
| Credit subaccount | For a released transaction, the subaccount the transaction credited when it was released, and for an unreleased transaction, the subaccount the transaction will credit if it is released. |
| Batch no. | The reference number of the batch generated for the transaction in the General ledger workspace. |
| Earning type | The earning time specified for the transaction to calculate the labour cost. |
| Multiplier | The multiplier to be used with the earning time to calculate the labour cost. |
| Released | When this check box is selected, the transaction has been released. If the check box is cleared, the transaction has not been released. |
| Allocated | When this check box is selected, the transaction has been allocated as either an underlying (source) transaction or an allocation transaction. If this check box is cleared, no allocation transaction has been yet generated for the transaction. |
| Allocation ref. number | The reference number of the allocation performed for the transaction. |
| Invoiced | When this check box is selected, the invoicing transactions have been already generated for this transaction. If this check box is cleared, this transaction did not yet spawn invoicing transactions. |
| Orig. doc. type | The type of the document that generated the transaction. |
| Orig. doc. no. | The number of the document that generated the transaction when releasing it. |
| Invoice ref. number | The reference number of the invoice generated when the transaction was used in invoicing. |
| Element | Description |
|---|---|
| Rate table | The rate table for which you want to view or specify sequences. |
| Rate type | The rate type for which you want to view or specify sequences. By using these rate types, you can use different rates in different steps of allocation rules. |
| Column | Description |
|---|---|
| View rates | This button opens the Rate table maintenance (PM206000) window, where you can view and modify the rate for the selected sequence. |
| Sequence | The sequence number. This number is automatically generated by the system, but you can change it manually. by clicking the arrow next to it. |
| Description | A description of the sequence. |
| Project | A check box that you use to indicate whether the project is a factor that affects rate selection. |
| Project task | A check box that you use to indicate whether the project task is a factor that affects rate selection. |
| Account group | A check box that you use to indicate whether the account group is a factor that affects rate selection. |
| Item | A check box that you use to indicate whether the item is a factor that affects rate selection. |
| Employee | A check box that you use to indicate whether the employee is a factor that affects rate selection. |
| Column | Description |
|---|---|
| Rate type | The unique ID for the rate type, an alphanumeric string of up to 10 characters. |
| Description | A more detailed description of the rate type. An alphanumeric string of up to 50 characters. |
| Column | Description |
|---|---|
| Rate table | The unique identifier for the rate table, an alphanumeric string of up to 10 characters. |
| Description | A more detailed description of the rate table. An alphanumeric string of up to 50 characters. |
| Element | Description |
|---|---|
| Rate table | The rate table, which is created in the Rate tables (PM204200) window and is configured on the current window. |
| Rate type | The rate type for which you want to view (and possibly change) rates. The rate types, which are defined in the Rate types (PM204100) window, are associated with particular steps of the allocation rules. |
| Sequence | The sequence of the rate table for which you want to view (and possibly change) rates. Sequences are created in the Rate lookup rules (PM205000) window. |
| Rate code | The rate code for which you want to define rates. You can create a new rate code by typing its identifier in this box (an alphanumeric string of up to 10 characters can be used). By using multiple rate codes with one sequence, you can specify for this sequence as many different rates (for different sets of particular factors defined by the sequence) as there are rate codes instead of creating a long list of similar sequences. For instance: suppose that you want to use different rates for three projects. |
| Description | The description of the rate code. |
| Element | Description |
|---|---|
| Start date | The start date of the range when the rate is valid. |
| End date | The end date of the range when the rate is valid. |
| Rate | The value of the rate for the selected sequence, rate code, and price class. When you run allocations, this value is assigned to the @Rate variable, which you can use in formulas to calculate the allocation amount, quantity, and other values. The value can be used as a multiplier, a constant, or an addend. |
| Element | Description |
|---|---|
| Project | The project for which you want to apply the rate specified on the Rate tab. |
| Description | The description of the project, as specified in the project settings. |
| Element | Description |
|---|---|
| Project task | The task for which you want to apply the rate specified on the Rate tab. |
| Description | The description of the project task. |
| Element | Description |
|---|---|
| Account group | The account group for which you want to apply the rate specified on the Rate tab. |
| Description | The description of the account group, as specified in the account group settings. |
| Element | Description |
|---|---|
| Item ID | The item for which you want to apply the rate specified on the Rate tab. |
| Description | The description of the item, as specified in the item settings. |
| Element | Description |
|---|---|
| Employee ID | The employee for which you want to apply the rate specified on the Rate tab. |
| Employee name | The name of the employee, as specified in the employee account. |
| Element | Description |
|---|---|
| Project ID | The project for which you want to view (and possibly edit) related restriction groups. |
| Status | Read-only. The status of the selected project. |
| Customer | Read-only. The customer for the selected project, if the project is external. For an internal project, this field is empty. |
| Template | Read-only. The template used for creating the selected project, if applicable. |
| Description | Read-only. The description of the selected project. |
| Column | Description |
|---|---|
| Group name | Read-only. The name of the restriction group. |
| Description | Read-only. The description of the restriction group. |
| Active | Read-only. A check box that indicates (if selected) that the restriction group is active. |
| Group type | Read-only. The type of the restriction group: A, A inverse, B, or B inverse. For more information, see: About types of restriction groups |
| Element | Description |
|---|---|
| Release | Releases the Projects transactions that you have selected. The transactions are immediately posted on release if the Automatically post on release check box is selected in the Project accounting preferences (PM101000) window. |
| Release all | Releases all the project transactions available on the list. The transactions may be posted on release, depending on the Automatically post on release setting. |
| Element | Description |
|---|---|
| Ref. no. | The identifier of the transaction, which was automatically assigned when the transaction was generated. |
| Transaction date | The date when the transaction was created. |
| Description | The description of the transaction. |
| Element | Description |
|---|---|
| Process | Reverses the not yet invoiced transactions you have selected in the table. |
| Process all | Reverses all not yet invoiced transactions listed in the table. |
| Element | Description |
|---|---|
| Allocation rule | The allocation rule for which not yet invoiced transactions will be listed, which you select from the list of available rules. If you do not select any value, the list in the table includes the transactions for all allocation rules. |
| Customer class | The customer class for which not yet invoiced transactions will be listed. Select a customer class to include in the table only the not yet invoiced transactions associated with the selected class. |
| Customer | The customer for which not yet invoiced transactions will be listed. Select a customer to include in the table only the not yet invoiced transactions associated with this customer. |
| Employee | The employee for which not yet invoiced transactions will be listed. Select an employee to include in the table only the not yet invoiced transactions associated with the selected employee. |
| Project | The project for which not yet invoiced transactions will be listed. Select a project to include in the table only the not yet invoiced transactions associated with this project. |
| Project task | The project task for which not yet invoiced transactions will be listed. Select a project task to include in the table only the not yet invoiced transactions associated with the selected project task. |
| Item ID | The item ID for which not yet invoiced transactions will be listed. Select the identifier of a stock or non-stock item to include in the table only the not yet invoiced transactions associated with this stock item. |
| From | The starting date of the date range for which not yet invoiced transactions will be included in the table. If you do not select this date, the table will include not yet invoiced transactions starting from the first not yet invoiced transaction available in the system. |
| To | The ending date of the date range for which not yet invoiced transactions will be included in the table. If you do not select this date, the table will include not yet invoiced transactions until the last not yet invoiced transaction available in the system. If you specify neither a From date nor a To date, the table includes all not yet invoiced transactions available in the system. |
| Element | Description |
|---|---|
| Ref. no. | The identifier of the transaction in Visma Net. |
| Date | The date the transaction was created. |
| Period | The financial period associated with the transaction. |
| Project | The project associated with the transaction. |
| Project task | The project task associated with the transaction. |
| Customer class | The customer class associated with the transaction. |
| Customer | The number of the customer associated with the transaction. |
| Customer name | The name of the customer. |
| Employee | The detailed description provided for the transaction. |
| Item ID | The identifier of the stock or non-stock item associated with the transaction. |
| Description | The description provided for the transaction. |
| UoM | The unit of measure used for the transaction, such as ITEM or BOX. |
| Quantity | The quantity for the transaction, such as the number of service hours provided to the customer. |
| Invoiceable | A check box that indicates whether the transaction is intended for charging any amounts to the customer. If this check box is not selected, the transaction does not affect the invoicing for the project. |
| Qty. that can be invoiced | The quantity that is used for invoicing the customer. For instance: You can invoice the customer based on the hours of service you provided to the customer. |
| Unit rate | The price of the item or rate of the service. |
| Amount | The amount of the transaction. |
| Invoicing rule | The invoicing rule associated with the transaction. |
| Branch | The branch in which the transaction was created. |
| Type of hour | The type of hour specified for the transaction to calculate the labour cost. |
| Multiplier | The multiplier to be used with the earning time to calculate the labour cost. |
| Button | Description |
|---|---|
| Allocate | Processes the project tasks you have selected and performs allocation of transaction amounts. |
| Allocate all | Processes all listed project tasks and performs allocation of transaction amounts. |
| Element | Description |
|---|---|
| Allocation rule | The rule for which you want to view projects. If you do not select any value here, the list in the table will include the project tasks for all allocation rules. |
| Project | The project whose tasks you want to view. If you do not select any value here, the list in the table will include all the active projects. |
| Customer class | The customer class for which you want to display data. If you select a value here, the list in the table will include only the active projects for the selected customer class. |
| Customer | The customer for which you want to display data. If you select a value here, the list in the table will include only the active projects for the selected customer. |
| Posting date | The date to assign all the allocation transactions that will be generated when running the allocation procedure. |
| From | The start date of the date range for which you want to allocate transactions. The system will allocate only transactions from the date range specified in the Date range restrictions section. If you do not select any value here, Visma Net will allocate transactions starting with the oldest allocation transaction in the system. |
| To | The end date of the date range for which you want to allocate transactions. The system will allocate only transactions from the date range specified in the Date range restrictions section. If you do not select any value here, Visma Net will allocate transactions up to the last allocation transaction in the system. |
| Column | Description |
|---|---|
| Project ID | The identifier of the project. |
| Description | The description of the project. |
| Allocation rule | The invoicing rule associated with the project to be used to generate invoices. |
| Customer | The number of the customer associated with the project. |
| Customer name | The name of the customer associated with the project. |
| Element | Description |
|---|---|
| Allocate | Processes the project tasks you have selected and performs allocation of transaction amounts. |
| Allocate all | Processes all listed project tasks and performs allocation of transaction amounts. |
| Element | Description |
|---|---|
| Allocation rule | The allocation rule whose tasks you want to list. If you do not select any value here, the list in the table will include the project tasks for all allocation rules. |
| Project | The project whose tasks you want to list. If you do not select any value here, the list in the table will include all the active project tasks. |
| Project task | The particular project task. If you do not select any task, the list in the table will include all the active project tasks. |
| Customer class | The customer class for which you want to display data. If you select a value here, the list in the table will include only the active project tasks for the selected customer class. |
| Customer | The customer for which you want to display data. If you select a value here, the list in the table will include only the active project tasks for the selected customer. |
| Posting date | The date to assign all the allocation transactions that will be generated when running the allocation procedure. |
| From | The start of the date range for which you want to allocate transactions. The system will allocate only transactions from the date range specified in the Date range restrictions section. If you do not select any value here, the system will allocate transactions starting with the oldest allocation transaction in the system. |
| To | The end of the date range for which you want to allocate transactions. The system will allocate only transactions from the date range specified in the Date range restrictions section. If you do not select any value here, the system will allocate transactions up to the last allocation transaction in the system. |
| Column | Description |
|---|---|
| Project | The identifier of the project. |
| Task ID | The identifier of the project task. |
| Description | The description of the project task. |
| Allocation rule | The allocation rule associated with the task. This allocation rule will be used for the allocation operation. |
| Customer | The customer associated with the project and the project task. |
| Element | Description |
|---|---|
| Process | Initiates the invoicing process for the projects you have selected (using the unlabelled check boxes) in the table. |
| Process all | Initiates the invoicing process for all the projects listed in the table. |
| Element | Description |
|---|---|
| Invoice date | The date to be specified on the invoices generated during the invoicing procedure, which also serves as a cut-off date for the project to be invoiced. For more information about how the system applies the filtering criteria for projects to be shown in the window, see: About project invoicing If no invoice date is specified, the system uses the following date as the invoice date, depending on the invoicing period of the projects:
|
| Post period | The financial period for which the invoice transactions will be posted. |
| Statement cycle | The statement cycle to which the customers to be listed are assigned. |
| Customer class | The customer class for which you want to invoice projects. Leave the field blank to view information on all classes. |
| Customer | The customer whose projects you want to invoice. Leave the field blank to see information on all customers of the specified class (or all customers of all classes). |
| Project template | The project template associated with the projects to be listed. Leave the field blank to view projects based on all templates. |
| Element | Description |
|---|---|
| Project | The project by its identifier. |
| Description | The description provided for the project. |
| Customer | The ID of the customer associated with the project, if any. |
| Customer name | The name of the customer. |
| From | The start date of the invoicing period that is the first not yet invoiced period for the project. |
| To | The end date of this invoicing period. |
| Last invoicing date | The date when the project was last invoiced. |
| Button | Description |
|---|---|
| Validate | Recalculates the balances for the projects you have selected. |
| Validate all | Recalculates the balances for all listed projects. |
| Element | Description |
|---|---|
| Recalculate not yet invoiced summary | If you select this check box, the system recalculates the balances that have not been invoiced. |
| Rebuild commitments | If you select this check box, the system will rebuild internal commitment records for the selected projects or for all listed projects. |
| Recalculate the amount of draft invoices | If you select this check box, the value of the Draft invoices amount column on the Revenue budget tab of the Projects (PM301000) window will be recalculated. |
| Recalculate change orders | When this check box is selected, the value affected by change orders in the Projects (PM301000) window will be recalculated for the selected projects or for all listed projects when you click Process or Process all in the window toolbar. |
| Column | Description |
|---|---|
| Project ID | The ID of the project. |
| Description | The description of the project. |
| Customer | The number of the customer for the project. |
| Customer name | The name of the customer for the project. |
| Status | The status of the project, which can be:
Projects that are in planning are not included in the list. |
| Start date | The date when the project was started. |
| End date | The date when the project was completed. |
| Element | Description |
|---|---|
| Template | The template to be used for the report, if any. |
| Locale | The country you want to runt the report for. The report is displayed in the local language of the country you select. |
| Default | Defines the selected template as the your default one. |
| Shared | Indicates that the selected template is shared with other users. |
| Element | Description |
|---|---|
| Report format | The format to be used for the report. Choose one of the following options:
|
| Period | The financial period the system will use to calculate the aging categories for the documents. You must specify a period. |
| Customer | The customer connected to the projects you want view. |
| Customer class | The customer class for which you want to display data. If you leave the field blank, you will see information about all classes. |
| From project | The ID of the project you want to start your selection on. |
| To project | The ID of the project to you want to end your selection on. |
| Project manager | The project manager of the projects you want view in the table. |
| Group by parent account | If you select this check box, you group customer accounts that are involved in parent-child relationship under a parent account, and display consolidated balance of the group. The system will group only those child accounts that have the Consolidate balance check box selected. The check box is available if the Parent-child customer relationship functionality in the Enable/disable functionalities (CS100000) window is enabled. |
| Element | >Description | >
|---|---|
| Property | >The report specific property you want to filter on. | >
| Condition | >
|
>
| Element | >Description | >
|---|---|
| Brackets | >( - (( - ((( - (((( - ((((( | >
| Property | >The report specific property you want to filter on. | >
| Condition | >Select one of the 13 conditions. They can be one-operand and two-operand. | >
| Value | >The value of the property. | >
| Second value | >Possible second value of the property. | >
| Brackets | >) - )) - ))) - )))) - ))))) | >
| Operator | >
|
>
| Element | >Description | >
|---|---|
| Deleted records | >Select what to do with deleted records: Hide them, print them, or show only deleted records. | >
| Print all pages | >Lets you print all pages of the report. | >
| Print in PDF format | >Displays the report in PDF format. | >
| Compress PDF file | >Indicates that the system will generate a compressed PDF. | >
| Embed fonts in PDF file | >Indicates that the system will generate the PDF with fonts embedded. | >
| Element | >Description | >
|---|---|
| Format | >The format (HTML, PDF, or Excel) in which the report will be e-mailed. | >
| To | >The email address of the recipient. | >
| Cc | >An additional addressee to receive a carbon copy (Cc) of the email. | >
| Bcc | >The email address of a person to receive a blind carbon copy (Bcc) of the email; an address entered in this field will be hidden from other recipients. | >
| Subject | >The subject of the email. | >
| Element | Description |
|---|---|
| Edit version | You choose this option if you want to edit the specific version. |
| Activate | You choose this option if you want to activate the specific version. |
| Version | The version of the report. |
| Description | The description of the report. |
| Active | Indicates whether the report is active or not. |
| Created | The date the version was created. |
| Element | Description |
|---|---|
| Reference no. | The reference number of the document. |
| Element | Description |
|---|---|
| Project ID | The project for which you want to view information. Select a project, or make no selection to request information for all projects. |
| Include unreleased activities | Select this check box to include the information of the unreleased activities in the report. |
| Element | Description |
|---|---|
| Owner | The employee for which you want to view information. Select an employee, or make no selection to request information for all employees. |
| Include unreleased activities | Select this check box to include the information of the unreleased activities in the report. |
| Element | Description |
|---|---|
| Period | The period until which the figures will be shown from the preceding six months. |
| From project | The project from which the figures will be reported. |
| To project | The project until which the figures will be reported. To include only one project in the report, select the same project as in the From project field. |
| Element | Description |
|---|---|
| Reference no. | The reference number of the document. |
| Element | Description |
|---|---|
| Reference number | The reference number of the document. You must select a document. |
| Element | Description |
|---|---|
| Reference number | The reference number of the document. You must select a document. |
| Element | Description |
|---|---|
| Reference number | The reference number of the document. You must select a document. |
| Element | Description |
|---|---|
| Reference number | The reference number of the document. You must select a document. |
| Element | Description |
|---|---|
| Reference number | The reference number of the document. You must select a document. |
| Element | Description |
|---|---|
| Customer no. | The customer whose projects and project tasks you want to view. If you leave this empty, the report will include all the projects in the system along with the project tasks; the projects and project tasks will be grouped by customer. |
| Element | Description |
|---|---|
| Document type | The type of the document to be printed you select from the drop-down. |
| Reference number | The reference number of the document to be printed. |
| Element | Description |
|---|---|
| Document type | The type of the document to be printed you select from the drop-down. |
| Reference number | The reference number of the document to be printed. |
| Element | Description |
|---|---|
| Document type | The type of the document to be printed you select from the drop-down. |
| Reference number | The reference number of the document to be printed. |
| Element | Description |
|---|---|
| Document type | The type of the document to be printed you select from the drop-down. |
| Reference number | The reference number of the document to be printed. |
| Element | Description |
|---|---|
| Document type | The type of the document to be printed you select from the drop-down. |
| Reference number | The reference number of the document to be printed. |
| Element | Description |
|---|---|
| Project | The project for which you want to view information. Select a project, or make no selection to request information for all projects. |
| Task | The task for which you want to view information. Select a task, or make no selection to request information for all tasks. |
| Element | Description |
|---|---|
| Include active projects | A check box you select to include the information of the active projects in the report. |
| Element | Description |
|---|---|
| Customer | To restrict the projects to be reported, select a customer whose projects you want to view. |
| From project | The project from which the figures will be reported. |
| To project | The project until which the figures will be reported. To include only one project in the report, select the same project as in the From project field. |
| Project manager | To restrict the projects to be reported, select a project manager whose projects you want to view. |
| Element | Description |
|---|---|
| Customer no. | The customer whose projects and project tasks you want to view. If you leave this empty, the report will include all the projects in the system along with the project tasks; the projects and project tasks will be grouped by customer. |
| Element | Description |
|---|---|
| Project | The project whose transactions you want to view. |